Send Message
products
PRODUCTS DETAILS
Home > Products >
Power Station CFB Boiler Membrane Water Wall For Cooling TUV Certification

Power Station CFB Boiler Membrane Water Wall For Cooling TUV Certification

MOQ: 1Set
Price: Negotiable
Standard Packaging: Seaworthy Packing
Delivery Period: 30 Days
Payment Method: L/C, T/T, Western Union, D/P, MoneyGram
Supply Capacity: 500 Tons/Month
Detail Information
Place of Origin
Zhangjiagang,Jiangsu,China
Brand Name
HD Boiler
Certification
ISO9001/SGS/TUV/ASME/EN
Model Number
Membrane Water Wall
Condition:
New
Structure:
Fire/Water Tube
Fuel:
Coal/Gas/Coal-fired/Water Heat
Type:
Energy Saving
Pressure:
Low/High Pressure
Range Of Applications:
Industrial/Power Station
Specification:
Customized
Manufacturing Level:
A
Surface Treatment:
Painted
Trademark:
HDB
HS Code:
3215960855
High Light:

boiler water wall panels

,

membrane water wall

Product Description

power station energy saving CFB boiler induction boiler Membrane water panel With TUV Certification

 

Product Description


Pressure loss caused by wall tubes (or risers, evaporator tubes) of a natural circulation boiler should be at low level because of the natural circulation principle. Thus, vertically installed riser tubes in natural circulation boilers have a larger diameter than riser tubes in forced circulation boilers. All natural circulation boilers must have an upwards-rising arrangement of wall tubes because of the circulation principle. There are variations on how sharp the rise is: In conservative vertical furnace boilers the wall tubes are placed in a straight vertical direction . In corner tube (Eckrohr) boilers the wall tubes are arranged as slightly rising or horizontal wall-tube banks.

 

Advantages of Membrane Water Panel


1). To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber.

2). To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.

3). The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down.

4). It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.

5) Compared with the bare tubes, the membrane water wall improves the heat absorption capacity of tubes.

6) The factory direct boiler membrane water wall could improve the Preliminary combination degree of boiler parts and reduce the installation workload.

 

Power Station CFB Boiler Membrane Water Wall For Cooling TUV Certification 0

 

Parameter

 

Name Membrane water panel
Material Carbon steel,Alloy,Stainless steel
Tube size Φ38 - 76 mm, or as required
Standard ISO , ASME
Model Studded
Application Istallable around the boiler combustion chamber
 

 

Features


1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safet

 

Company Introduction


Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.

 

Workshop


Power Station CFB Boiler Membrane Water Wall For Cooling TUV Certification 1

 

Certifications


Power Station CFB Boiler Membrane Water Wall For Cooling TUV Certification 2

 

 

products
PRODUCTS DETAILS
Power Station CFB Boiler Membrane Water Wall For Cooling TUV Certification
MOQ: 1Set
Price: Negotiable
Standard Packaging: Seaworthy Packing
Delivery Period: 30 Days
Payment Method: L/C, T/T, Western Union, D/P, MoneyGram
Supply Capacity: 500 Tons/Month
Detail Information
Place of Origin
Zhangjiagang,Jiangsu,China
Brand Name
HD Boiler
Certification
ISO9001/SGS/TUV/ASME/EN
Model Number
Membrane Water Wall
Condition:
New
Structure:
Fire/Water Tube
Fuel:
Coal/Gas/Coal-fired/Water Heat
Type:
Energy Saving
Pressure:
Low/High Pressure
Range Of Applications:
Industrial/Power Station
Specification:
Customized
Manufacturing Level:
A
Surface Treatment:
Painted
Trademark:
HDB
HS Code:
3215960855
Minimum Order Quantity:
1Set
Price:
Negotiable
Packaging Details:
Seaworthy Packing
Delivery Time:
30 Days
Payment Terms:
L/C, T/T, Western Union, D/P, MoneyGram
Supply Ability:
500 Tons/Month
High Light

boiler water wall panels

,

membrane water wall

Product Description

power station energy saving CFB boiler induction boiler Membrane water panel With TUV Certification

 

Product Description


Pressure loss caused by wall tubes (or risers, evaporator tubes) of a natural circulation boiler should be at low level because of the natural circulation principle. Thus, vertically installed riser tubes in natural circulation boilers have a larger diameter than riser tubes in forced circulation boilers. All natural circulation boilers must have an upwards-rising arrangement of wall tubes because of the circulation principle. There are variations on how sharp the rise is: In conservative vertical furnace boilers the wall tubes are placed in a straight vertical direction . In corner tube (Eckrohr) boilers the wall tubes are arranged as slightly rising or horizontal wall-tube banks.

 

Advantages of Membrane Water Panel


1). To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber.

2). To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.

3). The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down.

4). It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.

5) Compared with the bare tubes, the membrane water wall improves the heat absorption capacity of tubes.

6) The factory direct boiler membrane water wall could improve the Preliminary combination degree of boiler parts and reduce the installation workload.

 

Power Station CFB Boiler Membrane Water Wall For Cooling TUV Certification 0

 

Parameter

 

Name Membrane water panel
Material Carbon steel,Alloy,Stainless steel
Tube size Φ38 - 76 mm, or as required
Standard ISO , ASME
Model Studded
Application Istallable around the boiler combustion chamber
 

 

Features


1. Strength calculation report with applied materials information;
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
4. Hydraulic test report: ensure the standard working pressure and safet

 

Company Introduction


Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.

 

Workshop


Power Station CFB Boiler Membrane Water Wall For Cooling TUV Certification 1

 

Certifications


Power Station CFB Boiler Membrane Water Wall For Cooling TUV Certification 2

 

 

Sitemap |  Privacy Policy | China Good Quality Superheater Coil Supplier. Copyright © 2017-2024 Zhangjiagang HuaDong Boiler Co., Ltd. . All Rights Reserved.