|
MOQ: | 500 tons |
Price: | Negotiable |
Standard Packaging: | Seaworthy Packing |
Delivery Period: | 30 working days |
Payment Method: | L/C, T/T, Western Union |
Supply Capacity: | 500 tons/month |
Steel / Stainless Water Wall Panels Heat Exchanger / Boiler Parts With Water Wall Tubes
1). To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber.
2). To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.
3). The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down.
4). It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.
5) Compared with the bare tubes, the membrane water wall improves the heat absorption capacity of tubes.
6) The factory direct boiler membrane water wall could improve the Preliminary combination degree of boiler parts and reduce the installation workload
Parameter
Name | Membrane water panel |
Material | Carbon steel,Alloy,Stainless steel |
Tube size | Φ38 - 76 mm, or as required |
Standard | ISO , ASME |
Model | Studded |
Application | Utility/Power Station Boiler,Industrial |
Warranty
1. One year warranty
2. Spare parts available at ex-factory price
3. Different voltage available
4. 100% tested before delivery
5. Assist clients to prepare for the first construction, and also can arrange engineer
onsite instruction of installation and commissioning
6. Train the first-line operators;
7. Examine the equipment;
Workshop
Company Indroduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
Quality Control
1. Fabrication area of 200,000 square meters
2. 80 Engineers
3. 200 Coded welders
4. 30 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2015 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization
|
MOQ: | 500 tons |
Price: | Negotiable |
Standard Packaging: | Seaworthy Packing |
Delivery Period: | 30 working days |
Payment Method: | L/C, T/T, Western Union |
Supply Capacity: | 500 tons/month |
Steel / Stainless Water Wall Panels Heat Exchanger / Boiler Parts With Water Wall Tubes
1). To guarantee the leakproofness of furnace wall and reduce the air leak of combustion chamber.
2). To achieve the full water cooling of combustion chamber, and the boiler accessories membrane water wall is benefit to prevent coking under the condition of supplemental firing.
3). The thermal storage capacity is small, the warming of combustion chamber is fast and the cooling is also fast, which could shorten the cooling time of boiler’s start and furnace shut down.
4). It is good to adopt top supported water cooled wall and it could reduce the load of boiler framework, which is benefit to overhang.
5) Compared with the bare tubes, the membrane water wall improves the heat absorption capacity of tubes.
6) The factory direct boiler membrane water wall could improve the Preliminary combination degree of boiler parts and reduce the installation workload
Parameter
Name | Membrane water panel |
Material | Carbon steel,Alloy,Stainless steel |
Tube size | Φ38 - 76 mm, or as required |
Standard | ISO , ASME |
Model | Studded |
Application | Utility/Power Station Boiler,Industrial |
Warranty
1. One year warranty
2. Spare parts available at ex-factory price
3. Different voltage available
4. 100% tested before delivery
5. Assist clients to prepare for the first construction, and also can arrange engineer
onsite instruction of installation and commissioning
6. Train the first-line operators;
7. Examine the equipment;
Workshop
Company Indroduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
Quality Control
1. Fabrication area of 200,000 square meters
2. 80 Engineers
3. 200 Coded welders
4. 30 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2015 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization