Send Message
Home ProductsBoiler Manifold Headers

Low Pressure Boiler Economizer Parts Manifold Headers Power Plant Distributor Pipes

Low Pressure Boiler Economizer Parts Manifold Headers Power Plant Distributor Pipes

  • Low Pressure Boiler Economizer Parts Manifold Headers Power Plant Distributor Pipes
  • Low Pressure Boiler Economizer Parts Manifold Headers Power Plant Distributor Pipes
  • Low Pressure Boiler Economizer Parts Manifold Headers Power Plant Distributor Pipes
  • Low Pressure Boiler Economizer Parts Manifold Headers Power Plant Distributor Pipes
Low Pressure Boiler Economizer Parts Manifold Headers Power Plant Distributor Pipes
Product Details:
Place of Origin: China
Brand Name: HD BOILER
Certification: ISO9001 , SGS , TUV , ASME , EN
Model Number: Collector & Distributor Pipes
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set / Sets 10tons
Price: Negotiable
Packaging Details: Iron Frame Package
Delivery Time: 50 Days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 800 Tons / Year
Contact Now
Detailed Product Description
Condition: New Usage: Industry, Power Station
Pressure: High/Low Pressure Type: Pressure Part
Dimension: Customization Weight: 10~1000 Tons
Output: Hot Water / Steam Port: Shanghai
High Light:

Boiler Economizer Parts Manifold Headers

,

Low Pressure Boiler Manifold Headers

,

Power Plant Distributor Pipes Manifold Headers

Boiler Economizer Parts Manifold Header , Power Plant Distributor Pipes

 

 

Product process


In manufacturing, the key of end cover hinder is welding. Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production. When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers. Such welding methods have high manufacturing efficiency, good quality, beautiful welding shape, safety, reliability, etc.

 

Product Description


Headers are as big pipes that transfer water from the downcomers to the risers through a combustion zone where the water gets partially heated to steam from the heat of fuel combustion.The headers of boilers include water-cooling hinders of boilers proper, economizer hinders, superheater hinders, etc. They function for gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.

 

Test standard



JB/T3375 Boiler Material Instocking Acceptance Rules.
JB/T1610Technical Conditions of Boiler Hinders Manufacturing.
JB/T1613Technical Conditions of Boiler Pressure Parts Welding.
JB/T1612Technical Conditions of Boiler Water Pressure Test.


Product Category



The boiler headers have water wall header,superheater header,economizer header and so on. It acts action of gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.

 

Construction


Header construction is basically a miniature version of a simple steam drum (diameters are smaller than the ones of steam drums). However, in headers there are usually no internals except the orifices in forced circulation and once-through principle boilers. Small diameter headers are constructed from a tube with welded front and end plates, whereas the big headers are made of bent steel plates in the same way as steam drums.

Low Pressure Boiler Economizer Parts Manifold Headers Power Plant Distributor Pipes 0

 

Quality Control


1. Impact test and Strength calculation report with applied materials information.

2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.

3. X-ray, γ-ray and liquid penetrant test inspection report to ensure the quality of the entire boiler.

4. Hydraulic test report: ensure the standard working pressure and safety.

Low Pressure Boiler Economizer Parts Manifold Headers Power Plant Distributor Pipes 1

 

Contact Details
Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Person: Miss. Sandy Chen

Fax: 86- 512-58774453

Send your inquiry directly to us (0 / 3000)

Contact

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China