logo
Products
PRODUCTS DETAILS
Home > Products >
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications

High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications

MOQ: 1
Price: $1,574
Detail Information
Place of Origin
Jiangsu, China
Brand Name
HDB
Type:
Natural Circulation
Structure:
Water Tube
Pressure:
High Pressure
Style:
Horizontal
Fuel:
Biomass/Waste Heat, Waste, Biomass, Coal
Output:
Hot Water
Material:
Carbon Steel, Alloy Steel, ND Steel
Weight:
1-20 Ton
Diameter (OD):
76mm~914mm
Max Length:
23000mm
Temperature Range:
300~1500℃
Packing:
Iron Frame
Condition:
New
Weight (KG):
1000
Usage:
Industrial
Highlight:

High Pressure Boiler Manifold Headers

,

Water Tube Structure Steam Boiler Headers

,

1 Year Warranty Water Wall Panel Headers

Product Description
Power Plant Used Boiler Manifold Headers Assembly with Water Wall Panel ASME
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 0 High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 0
Headers collect and distribute steam or water from or to a series of smaller pipes or conduits. They are made of carbon or ferritic steel, generally of the same grade as the piping systems. Unlike piping systems which are usually butt welded and bent, headers are straight.
The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.
Depending on the temperature and pressure of headers, Vallourec supplies tubes in carbon steel to high-alloy ferritic steels such as T/P91 or T/P92, with sizes ranging from 88.9 mm to 406.4 mm.
Application
The steam boiler pressure part header with large diameter longitudinal welded pipe have water wall header, superheater header, economizer header and so on. It acts as collection, mixture, re-distributing working medium. As the structure, it can be classified as the end cover type (end enclosure) and necking down type.
Technical Parameters
Diameter (OD) ¢76mm~¢914mm
Length (Max) 23000mm
Temperature (℃) 300~1500
Similar Products
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 2 High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 2
Company Information
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 4 High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 4
Certificate
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 6 High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 6
FAQ
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 8 High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 8
Contact Us
Address: No.1 Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Tel: +86 (0) 512 5866 6196
Fax: +86(0) 512 5877 4453
Web: www.boilerfabrication.com
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 10 High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 10
Products
PRODUCTS DETAILS
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications
MOQ: 1
Price: $1,574
Detail Information
Place of Origin
Jiangsu, China
Brand Name
HDB
Type:
Natural Circulation
Structure:
Water Tube
Pressure:
High Pressure
Style:
Horizontal
Fuel:
Biomass/Waste Heat, Waste, Biomass, Coal
Output:
Hot Water
Material:
Carbon Steel, Alloy Steel, ND Steel
Weight:
1-20 Ton
Diameter (OD):
76mm~914mm
Max Length:
23000mm
Temperature Range:
300~1500℃
Packing:
Iron Frame
Condition:
New
Weight (KG):
1000
Usage:
Industrial
Minimum Order Quantity:
1
Price:
$1,574
Highlight

High Pressure Boiler Manifold Headers

,

Water Tube Structure Steam Boiler Headers

,

1 Year Warranty Water Wall Panel Headers

Product Description
Power Plant Used Boiler Manifold Headers Assembly with Water Wall Panel ASME
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 0 High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 0
Headers collect and distribute steam or water from or to a series of smaller pipes or conduits. They are made of carbon or ferritic steel, generally of the same grade as the piping systems. Unlike piping systems which are usually butt welded and bent, headers are straight.
The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.
Depending on the temperature and pressure of headers, Vallourec supplies tubes in carbon steel to high-alloy ferritic steels such as T/P91 or T/P92, with sizes ranging from 88.9 mm to 406.4 mm.
Application
The steam boiler pressure part header with large diameter longitudinal welded pipe have water wall header, superheater header, economizer header and so on. It acts as collection, mixture, re-distributing working medium. As the structure, it can be classified as the end cover type (end enclosure) and necking down type.
Technical Parameters
Diameter (OD) ¢76mm~¢914mm
Length (Max) 23000mm
Temperature (℃) 300~1500
Similar Products
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 2 High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 2
Company Information
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 4 High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 4
Certificate
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 6 High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 6
FAQ
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 8 High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 8
Contact Us
Address: No.1 Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Tel: +86 (0) 512 5866 6196
Fax: +86(0) 512 5877 4453
Web: www.boilerfabrication.com
High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 10 High Pressure Water Tube Structure Boiler Manifold Headers with 1 Year Warranty for Industrial Applications 10
Sitemap |  Privacy Policy | China Good Quality Superheater Coil Supplier. Copyright © 2017-2025 Zhangjiagang HuaDong Boiler Co., Ltd. . All Rights Reserved.