Send Message
Home ProductsBoiler Manifold Headers

ODM Coating Painted Boiler Manifold Headers Pin Welded With Refractory

ODM Coating Painted Boiler Manifold Headers Pin Welded With Refractory

  • ODM Coating Painted Boiler Manifold Headers Pin Welded With Refractory
  • ODM Coating Painted Boiler Manifold Headers Pin Welded With Refractory
  • ODM Coating Painted Boiler Manifold Headers Pin Welded With Refractory
  • ODM Coating Painted Boiler Manifold Headers Pin Welded With Refractory
ODM Coating Painted Boiler Manifold Headers Pin Welded With Refractory
Product Details:
Place of Origin: China
Brand Name: HD Boiler
Certification: ISO9001 , SGS , TUV , ASME , EN
Model Number: Super critical
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set / Sets 10tons
Price: Negotiable
Packaging Details: Seaworthy Packing
Delivery Time: 50 Days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 800 Tons / Year
Contact Now
Detailed Product Description
Specification: Thk : 60mm Installation Position: Hrsg Header
Material: 12Cr1MoVG / 15CrMoG / 20 G Application: Hrsg
Dimension: Customized Color: Painted Red
High Light:

Coating Painted Boiler Manifold Headers

,

ODM Boiler Manifold Headers

,

ODM boiler headers

ODM Pin Welded With Refractory Coating Painted Boiler Manifold Headers Boiler Parts
 
Product Description
 

Boiler headers, or boiler manifolds are designed to simplify piping near the boiler, reduce installation time, labor costs and parts used. Available in various branch options with threaded inlet and outlet connections. For closed loop heating applications only.

The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.

It is in accordance with the requirements that welding a certain length of round steel at the surface of the light pipe, then the refractory coating can be firmly laid on the water wall by using of pins.

 
1 Headers form an important part of all types of boilers.
2 Steam from the generating tubes is collected in headers which are therefore always under pressure.
3 This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4 Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

 

1 In manufacturing, the key of end cover hinder is welding.
2 Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends.
3 In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
4 When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers.

 

Details

 

1 The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.
2 In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.

 

Manufacturing Details of Headers

 

ODM Coating Painted Boiler Manifold Headers Pin Welded With Refractory 0

Features

 

Full strength(stick-through)

 

1.This is the most common joint style utilized today and can be applied to a variety of coil designs.

2.The joint is utilized in single or multiple row harp configurations and for both straight tube sidehill and bent tube radial layouts.

3.A variety of hole bevels are used depending on joint configuration.

4.They range from step bevels toconstant depth bevels.

 

Full penetration

 

1.The full penetration tube to header weld is also a common joint style,particularly in superheaters and regeaters.

2.The full penetration(full tube wall thickness)is accomplished by either a straight tube bore with the tube saddled on to the header or by spot face machining of the header to allowing more of a butt weld configuration.

 

Classification

 
Material Carbon steel,Alloy steel,Stainless steel.
Length According to costumes requirements.
Temperature Range 300℃~1500℃
Diameter(OD) 76mm~914mm

 

Transportation

 

ODM Coating Painted Boiler Manifold Headers Pin Welded With Refractory 1

Contact Details
Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Person: Miss. Sandy Chen

Fax: 86- 512-58774453

Send your inquiry directly to us (0 / 3000)

Contact

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China