Send Message
Home ProductsBoiler Economizer

Heat Exchange Fuel Gas Boiler Fin Tube Economizer For Power Plant Boiler

Heat Exchange Fuel Gas Boiler Fin Tube Economizer For Power Plant Boiler

  • Heat Exchange Fuel Gas Boiler Fin Tube Economizer For Power Plant Boiler
  • Heat Exchange Fuel Gas Boiler Fin Tube Economizer For Power Plant Boiler
  • Heat Exchange Fuel Gas Boiler Fin Tube Economizer For Power Plant Boiler
  • Heat Exchange Fuel Gas Boiler Fin Tube Economizer For Power Plant Boiler
Heat Exchange Fuel Gas Boiler Fin Tube Economizer For Power Plant Boiler
Product Details:
Place of Origin: ZHANGJIAGANG,CHINA
Brand Name: HD BOILER
Certification: ISO9001 , SGS , TUV , ASME , EN
Model Number: Furnace wall
Payment & Shipping Terms:
Minimum Order Quantity: 500 tons
Price: Negotiable
Packaging Details: Iron Frame Package
Delivery Time: 50 Days
Payment Terms: Western Union, L/C, T/T
Supply Ability: 500Sets / Month
Contact Now
Detailed Product Description
Function: Steam Boiler Structure: Tube Heat Exchanger
Material: Stainless Steel,aluminum Connector: Flange Or Thread Or Others
Usage: Power Plant/CFB Boiler Port: Shanghai
Specification: Customized Condition: New
High Light:

power plant economizer

,

economizer for boiler


 

Heat Exchange Fuel Gas Boiler Fin Tube Economizer For Power Plant Boiler

 

 

Product Description

Working principle of a flue-gases cooler is the same as in the above-described equipment, but the aim in this case is to cool a primary fluid, not to get a thermal profit by heating a secondary fluid.

These equipment are usually installed as the previous step to a flue-gases cleaning, to avoid the gases from reaching the cleaning systems at too high temperatures. This means an alternative to the dilution with air, which would imply an over-sizing of the mentioned systems

 

 

Details


Before designing this kind of equipment, it is necessary to know the nature of the gases to be cooled and their dust content. The purpose of all that is to design an equipment free of important fouling which would force to make cleaning works more frequently than wanted.

We must have in mind as well the availability to detach the dust from the gaseous stream containing it in all those areas where there is a bend or some enlarging in the pass section, which forces to include in the design some systems for dust collection and removal, to allow the correct heat exchange.

 

Functions


 

1. Absorb the heat of low-temperature flue gas, reduce the smoke discharge temperature, reduce smoke loss, and save fuel.

2. Since the feed water is heated in the economizer before entering the steam drum, the heat absorption of the feed water on the heating surface is reduced, and the economizer can be used to replace part of the evaporation heating surface with higher cost.

3. feed water temperature increased, into the drum will reduce the wall temperature difference, thermal stress corresponding to reduce, extend the service life of the drum.

 

Heat Exchange Fuel Gas Boiler Fin Tube Economizer For Power Plant Boiler 0

 

Design principle


When the designer's choice is the multi-cyclone collector,or the electrostatic precipitator,or a different type constructed of metals or ther low temperature materials,it becomes necessary to add a gas-cooling device.This is done to assure that he entering flue gases are with in the temperature range of 600 to 700F,with no possibility of even flashes of higher temperatures.

 

The exit temperature depends upon the materials used downstream from the cooling chamber.Since , however , experience and economical evaluations justifying the use of the high temperature alloys are not generally available this paper is based upon the exit temperatures stated above.

 

The two agents commonly used as cooling materials are air and water.Both have advantages and disadvantages.Generally,a combination of the two is found most acceptable.However,they must first be considered separately,so that the characteristics of each may be properly evaluated.

 

Workshop


Heat Exchange Fuel Gas Boiler Fin Tube Economizer For Power Plant Boiler 1

 

 

Company Information


 

HD Boiler offers a best in class facility,including:

  • Fabrication area of 200,000 square meters
  • 150 Engineers
  • 600 Coded welders
  • 60 Licensed Inspectors (including NDT level-lll instructors)
  • Grade-ALicenses for Design and Manufacture boiler (issued by the State Administration of Quality Supervision and Inspection)
  • ISO 90001:2008 Quality System
  • ASME Certificate of Utility Boiler
  • ASMES’ , ‘U’ and NB stamp authorization

 

Contact Details
Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Person: Miss. Sandy Chen

Fax: 86- 512-58774453

Send your inquiry directly to us (0 / 3000)

Contact

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China