| MOQ: | 3 |
| Price: | $2,000 |
| Description | Boiler economizer |
|---|---|
| Material | Alloy steel, Carbon steel, SA210C, SA213T22, etc. |
| Material standard | ASTM, EN or ISO etc. |
| Dimension | Customization |
| Weight | Min: 10 ton Max: 1000 ton |
| Smelting Process | EF+LF+VD |
| Process | Material→Ingot→Hot/Cold-Rolling→Heat treatment (Normalizing+tempering)→Inspection→Rough machining→UT→2nd Heat treatment→Finishing machining→Inspection |
| UT standard | ASTM A388 or EN10228, etc |
| MOQ: | 3 |
| Price: | $2,000 |
| Description | Boiler economizer |
|---|---|
| Material | Alloy steel, Carbon steel, SA210C, SA213T22, etc. |
| Material standard | ASTM, EN or ISO etc. |
| Dimension | Customization |
| Weight | Min: 10 ton Max: 1000 ton |
| Smelting Process | EF+LF+VD |
| Process | Material→Ingot→Hot/Cold-Rolling→Heat treatment (Normalizing+tempering)→Inspection→Rough machining→UT→2nd Heat treatment→Finishing machining→Inspection |
| UT standard | ASTM A388 or EN10228, etc |