| MOQ: | 5 |
| Price: | $55,000-60,000 |
| Description | Boiler economizer |
| Material | Stainless steel, Alloy steel, Carbon steel, etc. |
| Material Standard | ASTM, EN or ISO etc. |
| Dimension | Customization |
| Weight | Min: 10 ton - Max: 1000 ton |
| Smelting Process | EF+LF + VD |
| Process | Material→Ingot→Hot/Cold-Rolling→Heat treatment (Normalizing+ tempering)→Inspection→Rough machining→UT→2nd Heat treatment→Finishing machining→Inspection |
| UT Standard | ASTM A388 or EN10228, etc |
| MOQ: | 5 |
| Price: | $55,000-60,000 |
| Description | Boiler economizer |
| Material | Stainless steel, Alloy steel, Carbon steel, etc. |
| Material Standard | ASTM, EN or ISO etc. |
| Dimension | Customization |
| Weight | Min: 10 ton - Max: 1000 ton |
| Smelting Process | EF+LF + VD |
| Process | Material→Ingot→Hot/Cold-Rolling→Heat treatment (Normalizing+ tempering)→Inspection→Rough machining→UT→2nd Heat treatment→Finishing machining→Inspection |
| UT Standard | ASTM A388 or EN10228, etc |