![]() |
MOQ: | 10 Tons |
Standard Packaging: | steel frame |
Delivery Period: | 50-150 days |
Payment Method: | L/C,T/T |
Supply Capacity: | 9000 tons per year |
Attribute | Value |
---|---|
Product Name | Boiler Economizer |
Application | Waste Incinerator |
Material of Base Tube | SA210A1 |
Tube Dimension | OD50.8mm*5.17mm MWT |
Production Technique | Tube Bending |
Fabrication Standard | ASME |
The Boiler Economizer SA210A1 with handcuffs and tube shields is designed for waste incinerator applications. This heat recovery device is installed at the lower part of the boiler tail flue to efficiently recover waste heat from exhaust gases.
Description | Specification |
---|---|
Material | SA210A1 and SA36 |
Material standard | ASME |
Dimension | Customization |
Weight | Min: 10 ton Max: 1000 ton |
The boiler economizer operates in three distinct heating stages: feed water preheating, evaporation, and superheating. As the first stage in this process, the economizer preheats feed water, making it the lowest temperature heating surface in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water (non-boiling economizer).
Our products have been widely implemented in major power plants across China, delivering stable and significant economic benefits. We maintain a strong focus on product development and quality improvement, while actively expanding our international market presence through strategic partnerships.
![]() |
MOQ: | 10 Tons |
Standard Packaging: | steel frame |
Delivery Period: | 50-150 days |
Payment Method: | L/C,T/T |
Supply Capacity: | 9000 tons per year |
Attribute | Value |
---|---|
Product Name | Boiler Economizer |
Application | Waste Incinerator |
Material of Base Tube | SA210A1 |
Tube Dimension | OD50.8mm*5.17mm MWT |
Production Technique | Tube Bending |
Fabrication Standard | ASME |
The Boiler Economizer SA210A1 with handcuffs and tube shields is designed for waste incinerator applications. This heat recovery device is installed at the lower part of the boiler tail flue to efficiently recover waste heat from exhaust gases.
Description | Specification |
---|---|
Material | SA210A1 and SA36 |
Material standard | ASME |
Dimension | Customization |
Weight | Min: 10 ton Max: 1000 ton |
The boiler economizer operates in three distinct heating stages: feed water preheating, evaporation, and superheating. As the first stage in this process, the economizer preheats feed water, making it the lowest temperature heating surface in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water (non-boiling economizer).
Our products have been widely implemented in major power plants across China, delivering stable and significant economic benefits. We maintain a strong focus on product development and quality improvement, while actively expanding our international market presence through strategic partnerships.