![]() |
MOQ: | 3 TONS |
Price: | negotiable |
Standard Packaging: | Iron frame Packing |
Delivery Period: | Depands on Qty |
Payment Method: | 30% after contract and balance 70% before shipment,or 100% L/C at sight |
Supply Capacity: | 100 tons/Month |
Attribute | Value |
---|---|
Pressure | Low/High Pressure |
Material | Carbon Steel/Stainless Steel |
Color | Red/blue/silver |
Inlet Temperature | 150-300℃ |
Boiler Capacity | 1T-10T |
Application | Boiler System |
Port | Shanghai; Zhangjiagang |
Description | Specification |
---|---|
Material | Alloy steel, Carbon steel, SA210C, SA213T22, etc. |
Material standard | ASTM, EN or ISO etc. |
Dimension | Customization |
Weight | Min: 10 ton Max.:1000 ton |
Smelting Process | EF+LF + VD |
Process | Material→Ingot→Hot/Cold-Rolling→Heat treatment→Inspection→Machining→UT→2nd Heat treatment→Finishing→Inspection |
UT standard | ASTM A388 or EN10228, etc |
![]() |
MOQ: | 3 TONS |
Price: | negotiable |
Standard Packaging: | Iron frame Packing |
Delivery Period: | Depands on Qty |
Payment Method: | 30% after contract and balance 70% before shipment,or 100% L/C at sight |
Supply Capacity: | 100 tons/Month |
Attribute | Value |
---|---|
Pressure | Low/High Pressure |
Material | Carbon Steel/Stainless Steel |
Color | Red/blue/silver |
Inlet Temperature | 150-300℃ |
Boiler Capacity | 1T-10T |
Application | Boiler System |
Port | Shanghai; Zhangjiagang |
Description | Specification |
---|---|
Material | Alloy steel, Carbon steel, SA210C, SA213T22, etc. |
Material standard | ASTM, EN or ISO etc. |
Dimension | Customization |
Weight | Min: 10 ton Max.:1000 ton |
Smelting Process | EF+LF + VD |
Process | Material→Ingot→Hot/Cold-Rolling→Heat treatment→Inspection→Machining→UT→2nd Heat treatment→Finishing→Inspection |
UT standard | ASTM A388 or EN10228, etc |