Send Message
products
PRODUCTS DETAILS
Home > Products >
Boiler Economizer Banks Made Of SA210A1 With Shields For Waste Incinerator

Boiler Economizer Banks Made Of SA210A1 With Shields For Waste Incinerator

MOQ: 1 set
Price: Negotiable
Standard Packaging: Seaworthy packing
Delivery Period: 60~150 days
Payment Method: L/C, T/T, Western Union
Supply Capacity: 500 tons per month
Detail Information
Place of Origin
China
Brand Name
HDB
Certification
ASME, EN, ISO9001, SGS
Model Number
Boiler Economizer
Porduct Name:
Boiler Economizer Banks
Application:
Maintenance And Replacement
Material:
SA210A1 And SA240-309S
Keyword:
Boiler Economizer Bank
Production Technique:
Tube Bending, Assembly
Loading Port:
Shanghai, China
Highlight:

Shields Boiler Economizer

,

Waste Incinerator Boiler Economizer

,

SA210A1 Boiler Economizer

Product Description

 

Boiler Economizer Banks Made of SA210A1 With Shields For Waste Incinerator

 

Product Introdution

Economizer is a device installed at the lower part of the flue at the tail of the boiler to recover the waste heat of the exhaust gas. It heats the boiler feed water into a heating surface of saturated water under the pressure of the drum. Because it absorbs the heat of high-temperature flue gas, reduces the exhaust gas temperature, saves energy and improves efficiency, it is called an economizer.

 

Boiler economizer is kind of heat exchanger to heat the feed water using the flue gas heat. The flue gas coming from the tube outside is up and down cross-flow scrubbing the tube bundle, passing the heat to the tube wall. The water is flowing from bottom to top, and absorts the heat from the tube wall, and its temperature is getting high. This way not only can countercurrent heat transfer to save metal consumption, but also is good for water/steam to flow and exhaust as well as decreasing corrusion. One more, this way works well for dust cleaning.

 

 

Parameters of Boiler Economizer

 

Description Boiler economizer
Material SA210A1 and SA240-309S
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

   
Process Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames
   

Boiler Economizer Banks Made Of SA210A1 With Shields For Waste Incinerator 0

 

 

Working Process of Boiler Economizer

 

There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).

 

Company Profile

 

The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.

Boiler Economizer Banks Made Of SA210A1 With Shields For Waste Incinerator 1

products
PRODUCTS DETAILS
Boiler Economizer Banks Made Of SA210A1 With Shields For Waste Incinerator
MOQ: 1 set
Price: Negotiable
Standard Packaging: Seaworthy packing
Delivery Period: 60~150 days
Payment Method: L/C, T/T, Western Union
Supply Capacity: 500 tons per month
Detail Information
Place of Origin
China
Brand Name
HDB
Certification
ASME, EN, ISO9001, SGS
Model Number
Boiler Economizer
Porduct Name:
Boiler Economizer Banks
Application:
Maintenance And Replacement
Material:
SA210A1 And SA240-309S
Keyword:
Boiler Economizer Bank
Production Technique:
Tube Bending, Assembly
Loading Port:
Shanghai, China
Minimum Order Quantity:
1 set
Price:
Negotiable
Packaging Details:
Seaworthy packing
Delivery Time:
60~150 days
Payment Terms:
L/C, T/T, Western Union
Supply Ability:
500 tons per month
Highlight

Shields Boiler Economizer

,

Waste Incinerator Boiler Economizer

,

SA210A1 Boiler Economizer

Product Description

 

Boiler Economizer Banks Made of SA210A1 With Shields For Waste Incinerator

 

Product Introdution

Economizer is a device installed at the lower part of the flue at the tail of the boiler to recover the waste heat of the exhaust gas. It heats the boiler feed water into a heating surface of saturated water under the pressure of the drum. Because it absorbs the heat of high-temperature flue gas, reduces the exhaust gas temperature, saves energy and improves efficiency, it is called an economizer.

 

Boiler economizer is kind of heat exchanger to heat the feed water using the flue gas heat. The flue gas coming from the tube outside is up and down cross-flow scrubbing the tube bundle, passing the heat to the tube wall. The water is flowing from bottom to top, and absorts the heat from the tube wall, and its temperature is getting high. This way not only can countercurrent heat transfer to save metal consumption, but also is good for water/steam to flow and exhaust as well as decreasing corrusion. One more, this way works well for dust cleaning.

 

 

Parameters of Boiler Economizer

 

Description Boiler economizer
Material SA210A1 and SA240-309S
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

   
Process Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames
   

Boiler Economizer Banks Made Of SA210A1 With Shields For Waste Incinerator 0

 

 

Working Process of Boiler Economizer

 

There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).

 

Company Profile

 

The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.

Boiler Economizer Banks Made Of SA210A1 With Shields For Waste Incinerator 1

Sitemap |  Privacy Policy | China Good Quality Superheater Coil Supplier. Copyright © 2017-2025 Zhangjiagang HuaDong Boiler Co., Ltd. . All Rights Reserved.