Send Message
Home ProductsBoiler Economizer

SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation

SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation

  • SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation
  • SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation
  • SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation
  • SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation
SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation
Product Details:
Place of Origin: China
Brand Name: HDB
Certification: ASME, EN, ISO9001, SGS
Model Number: Boiler Economizer
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Seaworthy packing
Delivery Time: 60~150 days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 500 tons per month
Contact Now
Detailed Product Description
Porduct Name: Boiler Economizer Banks Application: Coal-fired Boilers And Waster Incinerator
Material: SA210A1 Keyword: Boiler Economizer
Production Technique: Hot Bending, Extrusion Loading Port: Shanghai, China
High Light:

Boiler Economizer With Manifolds Header Covered

,

Boiler Economizer With Thermal Insulation

,

Coal fired Extrusion Boiler Economizer

 

SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation

 

Product Introdution

Boiler low pressure economizer, also known as low temperature economizer or flue gas waste heat utilization: including economizer tube screen, heat exchange tube bundle, inlet box, outlet box, which is characterized by the inlet box through the pipe and low pressure heat return system heater connection, outlet box through the pipe connection deaerator, low pressure economizer installed in the boiler air preheater outlet tail flue.

The low pressure economizer is installed on the tail flue of the outlet of the boiler air preheater and is composed of a tube bundle, an inlet coupler and an outlet coupler. The tube bundle adopts finned modified tube structure, and the tube base tube and the surface of the fin are modified. The condensate water in the system is heated by the low pressure return heat, and the high temperature and low temperature can be switched, and the water is introduced into the deaerator. Reduce the boiler exhaust temperature and improve the circulating heat efficiency of power plant.

 

Competitive Advantage

 

1.Fuel saving: After the high temperature fuel gas released by fuel combustion transfers to the boiler water wall tubing, superheater, and reheater, the temperature is extremely high, the economizer makes it ideal for preventing heat loss. The economizer located at the flue of the boiler reduces the flue gas temperature, and maximizes the heat recovery to lower customer fuel costs.

 

2.Improvement of boiler steam drum working conditions: When entering the steam drum, the temperature of the feed water is increased after it has been heated using the economizer. The thermal stress caused by the temperature difference between the steam drum wall and the feed water is reduced, thus reducing the shrink and swell of the steam drum, and extends the service life.

 

3.Cost reduction of coal fired boilers: Water is being heated in the boiler economizer made using low temperature material. This makes the economizer a less costly replacement for high temperature boiler water wall tubing, and reduces overall boiler manufacturing costs.

 

Parameters of Boiler Economizer

 

Description Boiler economizer
Material SA210A1 and SA240-309S
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

   
Process Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames
   

 

 

SA210A1 Tubes Boiler Economizer With Manifolds Header Covered With Thermal Insulation 0

 

 

Working Process of Boiler Economizer

 

There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).

 

 

Contact Details
Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Person: Miss. Sandy Chen

Fax: 86- 512-58774453

Send your inquiry directly to us (0 / 3000)

Contact

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China