Send Message
Home ProductsBoiler Economizer

SA210A1 Tubes Made Boiler Economizer With Shields For Waste Incinerator

SA210A1 Tubes Made Boiler Economizer With Shields For Waste Incinerator

  • SA210A1 Tubes Made Boiler Economizer With Shields For Waste Incinerator
  • SA210A1 Tubes Made Boiler Economizer With Shields For Waste Incinerator
  • SA210A1 Tubes Made Boiler Economizer With Shields For Waste Incinerator
  • SA210A1 Tubes Made Boiler Economizer With Shields For Waste Incinerator
SA210A1 Tubes Made Boiler Economizer With Shields For Waste Incinerator
Product Details:
Place of Origin: China
Brand Name: HDB
Certification: ASME, EN, ISO9001, SGS
Model Number: Boiler Economizer
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Seaworthy packing
Delivery Time: 60~150 days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 500 tons per month
Contact Now
Detailed Product Description
Porduct Name: Boiler Economizer Application: Coal-fired Boilers And Waster Incinerator
Material: SA210A1 And SA240-309S Keyword: Boiler Economizer Banks
Production Technique: Hot Bending, Extrusion Loading Port: Shanghai, China
High Light:

SA210A1 Boiler Tubes Economizer

,

ASME Boiler Tubes Economizer

,

SA210A1 Boiler Economizer Banks

 

SA210A1 Tubes Made Boiler Economizer With Shields For Waste Incinerator

 

Product Introdution

Economizer  is a device installed at the lower part of the flue at the tail of the boiler to recover the waste heat of the exhaust gas. It heats the boiler feed water into a heating surface of saturated water under the pressure of the drum. Because it absorbs the heat of high-temperature flue gas, reduces the exhaust gas temperature, saves energy and improves efficiency, it is called an economizer.

 

Parameters of Boiler Economizer

 

Description Boiler economizer
Material Alloy steel, Carbon steel, SA210C ,SA213T22, etc.
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

   
Process Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames
   

SA210A1 Tubes Made Boiler Economizer With Shields For Waste Incinerator 0

 

 

Working Process of Boiler Economizer

 

There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).

 

Company Profile

 

The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.

SA210A1 Tubes Made Boiler Economizer With Shields For Waste Incinerator 1

Contact Details
Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Person: Miss. Sandy Chen

Fax: 86- 512-58774453

Send your inquiry directly to us (0 / 3000)

Contact

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China