Place of Origin: | China |
Brand Name: | HDB |
Certification: | ASME, EN, ISO9001, SGS |
Model Number: | Boiler Economizer |
Minimum Order Quantity: | 1 set |
---|---|
Price: | Negotiable |
Packaging Details: | Seaworthy packing |
Delivery Time: | 60~150 days |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 500 tons per month |
Porduct Name: | Boiler Economizer | Application: | Coal-fired Boilers And Waster Incinerator |
---|---|---|---|
Material: | SA210A1 And SA240-309S | Keyword: | Boiler Economizer Banks |
Production Technique: | Hot Bending, Extrusion | Loading Port: | Shanghai, China |
High Light: | SA210A1 Boiler Tubes Economizer,ASME Boiler Tubes Economizer,SA210A1 Boiler Economizer Banks |
SA210A1 Tubes Made Boiler Economizer With Shields For Waste Incinerator
Product Introdution
Economizer is a device installed at the lower part of the flue at the tail of the boiler to recover the waste heat of the exhaust gas. It heats the boiler feed water into a heating surface of saturated water under the pressure of the drum. Because it absorbs the heat of high-temperature flue gas, reduces the exhaust gas temperature, saves energy and improves efficiency, it is called an economizer.
Parameters of Boiler Economizer
Description | Boiler economizer |
Material | Alloy steel, Carbon steel, SA210C ,SA213T22, etc. |
Material standard | ASTM, EN or ISO etc. |
Dimension | Customization |
Weight |
Min: 10 ton Max.:1000 ton |
Process | Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames |
Working Process of Boiler Economizer
There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).
Company Profile
The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.
Contact Person: Wendy
Tel: +8618351692506
Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China