Send Message
Home ProductsBoiler Economizer

ASME Standard Boiler Economizer Banks Of CS Tubes For Waste Incinerators

ASME Standard Boiler Economizer Banks Of CS Tubes For Waste Incinerators

  • ASME Standard Boiler Economizer Banks Of CS Tubes For Waste Incinerators
  • ASME Standard Boiler Economizer Banks Of CS Tubes For Waste Incinerators
  • ASME Standard Boiler Economizer Banks Of CS Tubes For Waste Incinerators
ASME Standard Boiler Economizer Banks Of CS Tubes For Waste Incinerators
Product Details:
Place of Origin: China
Brand Name: HDB
Certification: ASME, EN, ISO9001, SGS
Model Number: Boiler Economizer
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Seaworthy packing
Delivery Time: 60~150 days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 500 tons per month
Contact Now
Detailed Product Description
Porduct Name: Boiler Economizer Bank Application: Coal-fired Boilers And Waster Incinerator
Material Of Base Tube: SA210A1 Keyword: Boiler Economizer
Production Technique: Hot Bending, Extrusion Packing: Steel Frames
High Light:

ASME Standard Boiler Economizer Banks

,

Boiler Economizer of CS Tubes

,

Boiler Economizer For Waste Incinerators

Boiler Economizer Banks Made of CS Tubes in ASME Standard for Waste Incinerators​

 

Product Introdution

Our economizers are generally made of 20 low and medium pressure boiler pipes, 20G seamless steel tubes or ASME grade steel tubes. It reduces the flue gas temperature and maximizes the heat recovery to help customers reduce fuel costs.

ASME Standard Boiler Economizer Banks Of CS Tubes For Waste Incinerators 0

 

Parameters of Boiler Economizer

 

Description Boiler economizer
Material Alloy steel, Carbon steel, SA210C ,SA213T22, etc.
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

   
Process Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames
   

 

 

 

Working Process of Boiler Economizer

 

There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).

ASME Standard Boiler Economizer Banks Of CS Tubes For Waste Incinerators 1

Company Profile

 

The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.

ASME Standard Boiler Economizer Banks Of CS Tubes For Waste Incinerators 2

Contact Details
Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Person: Miss. Sandy Chen

Fax: 86- 512-58774453

Send your inquiry directly to us (0 / 3000)

Contact

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China