MOQ: | 1Set |
Price: | Negotiable |
Standard Packaging: | Seaworthy Packing |
Delivery Period: | 30 Days |
Payment Method: | L/C, T/T, Western Union, D/P, MoneyGram |
Supply Capacity: | 500 Tons/Month |
High Pressure Performance Heat Exchanger Superheater and Reheater For For industry boiler TUV
Product Description
Superheating raises overall efficiency as well as avoids too much condensation in last stages of turbine which avoids blade erosion.
The heat of combustion gases from furnace is utilised for removal of moisture from steam and to superheat the steam.
Super-heaters ususlly have several tube circuits in parallel with one or more return bends,connected between headers.
Heat from the hot gases to the vapour in the surperheater is transferred at high temperatures.
Therefore promary section of superheater is arranged in counterflow and secondary section in parallel flow to reduce the temp.stressing of the tube wall.
ASME certificate boiler parts boiler superheater China factory direct sell
1)Both Radiant-Convective and 100% Convective Available
2)Assemblies Completely Self-Supporting (No Intermediate Support Brick Required
3)All Elements of Equivalent Length Ensuring Balanced Flow
4)Conservative Velocities Inside Tubes Assure Positive Cooling at All Loads
5)Fully Drainable
Design structure
1. heating saturated steam, temperature up to 900 degree C.
2. high efficiency, >90%.
3. high speed heating.
4. design with stainless steel.
5. long design service life, 15 years.
Thechnical parameters
Material | carbon steel, alloy steel , or durable heat steel |
Tube OD | 10-114mm |
Tube W.T. | 0.8mm- 15mm |
Type | Advantages | Disadvantages | Supporting method |
Pendant-type | 1.Firm structural support | 1. Flow blockage by condensed steam 2. Needs slow restart to purge the water that accumulates in the bottom. | supported from above |
Inverted-type | 1.Proper drainage of the condensed steam | 1. Lack the structural rigidity, especially in high speed gas flow | Supported from below |
Horizontal -type |
1. Proper drainage 2. Good structural rigidity. |
1. They do not view the flam directly so they are mainly from the convective type | Usually supported in the vertical gas ducts parallel to the main furnace. |
Workshop
Send us required technical data, such as steam capacity, presure, required temperature etc. We will design accordingly.
Certifications
Company Introduction
Established in 1985, Zhangjiagang Hua Dong Boiler Co., Ltd. (trading as HD Boiler), is a professional industrial manufacturer, producing utility boiler,industrial boiler,HRSG boiler and all kinds of boiler parts, such as waterwall panels, economizers, air preheaters, superheaters, headers, spiral fin tubes, H-fin tubes, heat pipes etc. HD Boiler is located in Dong Lai Industrial Park, east suburb of Zhang Jia Gang City. The plant’s location is around 150km Expressway to Shanghai Port.
1. Fabrication area of 200,000 square meters
2. 80 Engineers
3. 200 Coded welders
4. 30 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization
MOQ: | 1Set |
Price: | Negotiable |
Standard Packaging: | Seaworthy Packing |
Delivery Period: | 30 Days |
Payment Method: | L/C, T/T, Western Union, D/P, MoneyGram |
Supply Capacity: | 500 Tons/Month |
High Pressure Performance Heat Exchanger Superheater and Reheater For For industry boiler TUV
Product Description
Superheating raises overall efficiency as well as avoids too much condensation in last stages of turbine which avoids blade erosion.
The heat of combustion gases from furnace is utilised for removal of moisture from steam and to superheat the steam.
Super-heaters ususlly have several tube circuits in parallel with one or more return bends,connected between headers.
Heat from the hot gases to the vapour in the surperheater is transferred at high temperatures.
Therefore promary section of superheater is arranged in counterflow and secondary section in parallel flow to reduce the temp.stressing of the tube wall.
ASME certificate boiler parts boiler superheater China factory direct sell
1)Both Radiant-Convective and 100% Convective Available
2)Assemblies Completely Self-Supporting (No Intermediate Support Brick Required
3)All Elements of Equivalent Length Ensuring Balanced Flow
4)Conservative Velocities Inside Tubes Assure Positive Cooling at All Loads
5)Fully Drainable
Design structure
1. heating saturated steam, temperature up to 900 degree C.
2. high efficiency, >90%.
3. high speed heating.
4. design with stainless steel.
5. long design service life, 15 years.
Thechnical parameters
Material | carbon steel, alloy steel , or durable heat steel |
Tube OD | 10-114mm |
Tube W.T. | 0.8mm- 15mm |
Type | Advantages | Disadvantages | Supporting method |
Pendant-type | 1.Firm structural support | 1. Flow blockage by condensed steam 2. Needs slow restart to purge the water that accumulates in the bottom. | supported from above |
Inverted-type | 1.Proper drainage of the condensed steam | 1. Lack the structural rigidity, especially in high speed gas flow | Supported from below |
Horizontal -type |
1. Proper drainage 2. Good structural rigidity. |
1. They do not view the flam directly so they are mainly from the convective type | Usually supported in the vertical gas ducts parallel to the main furnace. |
Workshop
Send us required technical data, such as steam capacity, presure, required temperature etc. We will design accordingly.
Certifications
Company Introduction
Established in 1985, Zhangjiagang Hua Dong Boiler Co., Ltd. (trading as HD Boiler), is a professional industrial manufacturer, producing utility boiler,industrial boiler,HRSG boiler and all kinds of boiler parts, such as waterwall panels, economizers, air preheaters, superheaters, headers, spiral fin tubes, H-fin tubes, heat pipes etc. HD Boiler is located in Dong Lai Industrial Park, east suburb of Zhang Jia Gang City. The plant’s location is around 150km Expressway to Shanghai Port.
1. Fabrication area of 200,000 square meters
2. 80 Engineers
3. 200 Coded welders
4. 30 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization