MOQ: | 1 Set / Sets 10tons |
Price: | Negotiable |
Standard Packaging: | Seaworthy Packing |
Delivery Period: | 30 days |
Payment Method: | Western Union, L/C, T/T |
Supply Capacity: | 500 Tons per month |
Stainless Steel Container Shipment Higher Resistance To Corrosion Heat Exchanger ASME
Introduction
Exhaust heat loss is the largest of the heat loss of the power plant boiler, usually 5% to 8%, accounting for 80% of the total heat loss of the boiler or higher. |
The main factors that affect the heat loss of the exhaust gas are the boiler exhaust temperature. Under normal circumstances, the exhaust heat temperature increases by 10 ℃ and the exhaust heat loss increases by 0.6% ~ 1.0%. |
China's current thermal power units in the boiler exhaust gas temperature is generally around 125 ~ 150 ℃, the actual smoke temperature is higher than the design value is ubiquitous phenomenon. |
Low temperature economizer
"Low temperature economizer", can greatly reduce the flue gas temperature, so that the flue gas temperature be reduced lower 40 ~ 50 ℃ or more. |
The energy absorbed by the "low temperature economizer" can be used to heat the condensate or to increase the temperature of the combustion air by heating the air through the heater. |
Power plant boiler using "low temperature economizer", can save 1 ~ 4g / kWh, unit efficiency increased by 0.2 to 1.2%. "Low temperature economizer" in the full recovery and utilization of exhaust heat at the same time, but also to achieve the best desulfurization efficiency of smoke temperature, greatly reducing the desulfurization tower to reduce the smoke and water spray cooling water consumption. |
Under normal circumstances, it takes 1 ~3 years for power plant 1 to recover the investment in "low temperature economizer" and its system equipment , that is to say, the economic benefits are enormous. |
*Note:HD BOILER can bespoke special type of economizer according to customer's requirement.
Technical specifications:
Material Structure
Consists of a serious of spiral fin tubes, the headers of inlet and outlet, bend, frame and other auxiliaries.
Structure Arrangement
In line / staggered arrangement.
Manufacturing and acceptance criteria:
· JB/T6512 "boiler with a high-frequency resistance welding spiral fin tube manufacturing technology conditions"
· HG/T3181 "high-frequency resistance welding spiral fin tube"
· JB/T6511 "spiral finned tube test technical conditions."
· JB1611 "boiler tube mane box assembly conditions"
· JB/T1612 "boiler pressurufacturing conditions."
· JB16I3 "boiler pressure parts welding conditions."
Company Introduction
HD Boiler offers a best in class facility,including:
MOQ: | 1 Set / Sets 10tons |
Price: | Negotiable |
Standard Packaging: | Seaworthy Packing |
Delivery Period: | 30 days |
Payment Method: | Western Union, L/C, T/T |
Supply Capacity: | 500 Tons per month |
Stainless Steel Container Shipment Higher Resistance To Corrosion Heat Exchanger ASME
Introduction
Exhaust heat loss is the largest of the heat loss of the power plant boiler, usually 5% to 8%, accounting for 80% of the total heat loss of the boiler or higher. |
The main factors that affect the heat loss of the exhaust gas are the boiler exhaust temperature. Under normal circumstances, the exhaust heat temperature increases by 10 ℃ and the exhaust heat loss increases by 0.6% ~ 1.0%. |
China's current thermal power units in the boiler exhaust gas temperature is generally around 125 ~ 150 ℃, the actual smoke temperature is higher than the design value is ubiquitous phenomenon. |
Low temperature economizer
"Low temperature economizer", can greatly reduce the flue gas temperature, so that the flue gas temperature be reduced lower 40 ~ 50 ℃ or more. |
The energy absorbed by the "low temperature economizer" can be used to heat the condensate or to increase the temperature of the combustion air by heating the air through the heater. |
Power plant boiler using "low temperature economizer", can save 1 ~ 4g / kWh, unit efficiency increased by 0.2 to 1.2%. "Low temperature economizer" in the full recovery and utilization of exhaust heat at the same time, but also to achieve the best desulfurization efficiency of smoke temperature, greatly reducing the desulfurization tower to reduce the smoke and water spray cooling water consumption. |
Under normal circumstances, it takes 1 ~3 years for power plant 1 to recover the investment in "low temperature economizer" and its system equipment , that is to say, the economic benefits are enormous. |
*Note:HD BOILER can bespoke special type of economizer according to customer's requirement.
Technical specifications:
Material Structure
Consists of a serious of spiral fin tubes, the headers of inlet and outlet, bend, frame and other auxiliaries.
Structure Arrangement
In line / staggered arrangement.
Manufacturing and acceptance criteria:
· JB/T6512 "boiler with a high-frequency resistance welding spiral fin tube manufacturing technology conditions"
· HG/T3181 "high-frequency resistance welding spiral fin tube"
· JB/T6511 "spiral finned tube test technical conditions."
· JB1611 "boiler tube mane box assembly conditions"
· JB/T1612 "boiler pressurufacturing conditions."
· JB16I3 "boiler pressure parts welding conditions."
Company Introduction
HD Boiler offers a best in class facility,including: