Send Message
Home ProductsBoiler Manifold Headers

Bule 12Cr1MoVG / 15CrMoG Boiler Header Manifolds For Coal Fired Plant

Bule 12Cr1MoVG / 15CrMoG Boiler Header Manifolds For Coal Fired Plant

  • Bule 12Cr1MoVG / 15CrMoG Boiler Header Manifolds For Coal Fired Plant
  • Bule 12Cr1MoVG / 15CrMoG Boiler Header Manifolds For Coal Fired Plant
  • Bule 12Cr1MoVG / 15CrMoG Boiler Header Manifolds For Coal Fired Plant
Bule 12Cr1MoVG / 15CrMoG Boiler Header Manifolds For Coal Fired Plant
Product Details:
Place of Origin: China
Brand Name: HD Boiler
Certification: ISO9001 , SGS , TUV , ASME , EN
Model Number: Ultra - supercritical
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set / Sets 10tons
Price: Negotiable
Packaging Details: Seaworthy Packing
Delivery Time: 50 Days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 800 Tons / Year
Contact Now
Detailed Product Description
Specification: Thk 98mm Installation Position: Water Wall Panel Header
Material: 12Cr1MoVG / 15CrMoG Application: Coal Fired Plant
Dimension: Customized Color: Blue
High Light:

Alloy steel header in boiler

,

98mm Boiler Header Manifolds

,

Bule Boiler Header Manifolds

The thicknest header 98mm ultra supercritical supply for top three boiler manufacturers Harbin Boiler Company
 
Product Description
 
1 Headers form an important part of all types of boilers.
2 Steam from the generating tubes is collected in headers which are therefore always under pressure.
3 This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4 Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

 

1 In manufacturing, the key of end cover hinder is welding.
2 Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends.
3 In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
4 When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers.

 

Details

 

1 The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.
2 In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.

 

Features

 

1 Strength calculation report with applied materials information.
2 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4 Hydraulic test report: ensure the standard working pressure and safety.
5 Excellent in welding quality, highly automatic, safe and reliable.

 

Bule 12Cr1MoVG / 15CrMoG Boiler Header Manifolds For Coal Fired Plant 0

 

Classification

 
Material Carbon steel,Alloy steel,Stainless steel.
Length According to costumes requirements.
Temperature Range 300℃~1500℃
Diameter(OD) 76mm~914mm

Bule 12Cr1MoVG / 15CrMoG Boiler Header Manifolds For Coal Fired Plant 1 

Contact Details
Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Person: Miss. Sandy Chen

Fax: 86- 512-58774453

Send your inquiry directly to us (0 / 3000)

Contact

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China