MOQ: | 1Set 10 Tons |
Price: | Negotiable |
Standard Packaging: | Iron frame package |
Delivery Period: | 30-100 days |
Payment Method: | L/C, D/A, T/T, Western Union, MoneyGram |
Supply Capacity: | 500tons per month |
Name | Economical low installation costs better performance boiler economizer for CFB boiler |
specifications of finned tube | unit(mm) |
Bare pipe(od) | 25-165 |
bare pipe(thick) | 2-8 |
finned thicks | 0.6-3.0 |
finned height | 5-30 |
finned tube thread pitch | 5-30 |
finned tube length | </=12000 |
Remark | 1.Other specifications outside the table should be proposed, it is negotiable. 2.Generally speaking, the height of the fin <=1/2d 3 The spiral finned tubes produced by our company are manufactured according to the principle:JB/T6512-92 DG1020-97 |
Accessory:
The boiler economizer acts as a waste heat recovery device, ensuring that this heat does not go unused.
Instead, the heat is used to essentially preheat the water, so that less heat is required to bring the water to a temperature high enough to make steam
boiler parts Heat exchanger H Fin tube economizer used in utility boilers, industrial boilers, marine power, such as the tail of heat exchanger components.
Performance characteristics :
1. Excellent anti-wear performance
2. Less fouling
3. Compact space
4. Welded Joints less
5. Stability
Other products:
Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer.
Certificate:
Company Introduction:
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
MOQ: | 1Set 10 Tons |
Price: | Negotiable |
Standard Packaging: | Iron frame package |
Delivery Period: | 30-100 days |
Payment Method: | L/C, D/A, T/T, Western Union, MoneyGram |
Supply Capacity: | 500tons per month |
Name | Economical low installation costs better performance boiler economizer for CFB boiler |
specifications of finned tube | unit(mm) |
Bare pipe(od) | 25-165 |
bare pipe(thick) | 2-8 |
finned thicks | 0.6-3.0 |
finned height | 5-30 |
finned tube thread pitch | 5-30 |
finned tube length | </=12000 |
Remark | 1.Other specifications outside the table should be proposed, it is negotiable. 2.Generally speaking, the height of the fin <=1/2d 3 The spiral finned tubes produced by our company are manufactured according to the principle:JB/T6512-92 DG1020-97 |
Accessory:
The boiler economizer acts as a waste heat recovery device, ensuring that this heat does not go unused.
Instead, the heat is used to essentially preheat the water, so that less heat is required to bring the water to a temperature high enough to make steam
boiler parts Heat exchanger H Fin tube economizer used in utility boilers, industrial boilers, marine power, such as the tail of heat exchanger components.
Performance characteristics :
1. Excellent anti-wear performance
2. Less fouling
3. Compact space
4. Welded Joints less
5. Stability
Other products:
Our main products including CFB boiler, coal fired boiler and boiler parts such as tubular air pre-heater, rotary air pre-heater, super heater, re-heater, header, membrane water wall and economizer.
Certificate:
Company Introduction:
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.