MOQ: | 1 Set/Sets 10tons |
Price: | Negotiable |
Standard Packaging: | Iron frame package |
Delivery Period: | 30 Days |
Payment Method: | L/C, T/T, Western Union, D/P |
Supply Capacity: | 500 Tons per month |
Heat Exchanger for Boiler Parts Spare part boiler economizer TUV
Production Despriction
H fin tube type economizer is high efficient heat exchange economizer, which is consisted of H type fin tubes.The equipment body can be designed into many modules to ensure the long term and stable running.Wall surface temperature can be adjusted according to the boiler load and fuel changer to avoid corrosion under low temperature.
Quality Control
1. Impact test and Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.
3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.
Parameter
Name(unit) | Specification(mm) |
Bare pipe(OD) | 25-165 |
Bare pipe(Thickness) | 2-8 |
Fin (Thickness) | 0.6-3.0 |
Fin (Height) | 5-30 |
Fin tube thread pitch | 5-30 |
Fin tube length | ≤12000 |
*Note:HD BOILER can bespoke special type of economizer according to customer's requirement.
Economizer work shop
Certificate
ASME 'S' & 'U' STAMP
Company Indroduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
1. Fabrication area of 400,000 square meters
2. 150 Engineers
3. 600 Coded welders
4. 60 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization
MOQ: | 1 Set/Sets 10tons |
Price: | Negotiable |
Standard Packaging: | Iron frame package |
Delivery Period: | 30 Days |
Payment Method: | L/C, T/T, Western Union, D/P |
Supply Capacity: | 500 Tons per month |
Heat Exchanger for Boiler Parts Spare part boiler economizer TUV
Production Despriction
H fin tube type economizer is high efficient heat exchange economizer, which is consisted of H type fin tubes.The equipment body can be designed into many modules to ensure the long term and stable running.Wall surface temperature can be adjusted according to the boiler load and fuel changer to avoid corrosion under low temperature.
Quality Control
1. Impact test and Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.
3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.
Parameter
Name(unit) | Specification(mm) |
Bare pipe(OD) | 25-165 |
Bare pipe(Thickness) | 2-8 |
Fin (Thickness) | 0.6-3.0 |
Fin (Height) | 5-30 |
Fin tube thread pitch | 5-30 |
Fin tube length | ≤12000 |
*Note:HD BOILER can bespoke special type of economizer according to customer's requirement.
Economizer work shop
Certificate
ASME 'S' & 'U' STAMP
Company Indroduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
1. Fabrication area of 400,000 square meters
2. 150 Engineers
3. 600 Coded welders
4. 60 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization