MOQ: | 1 set |
Price: | Negotiable |
Standard Packaging: | Seaworthy Packing |
Delivery Period: | 30 - 60Days |
Payment Method: | L/C, T/T , Western Union |
Supply Capacity: | 500 Tons/Month |
High Efficient Finned Tube For Industrial Boiler Energy Saving Heating Surface
Product description of Fin Tube
Finned tube is a new kind of heat transfer material which has the feature of wearing resistance and high efficient.Finned tube heat exchanger for heat transfer between air, gas and liquids or steam. Heat exchanger with finned heating surfaces, so-called finned tube heat exchanger, offer the possibility of heat transfer between gases and liquids significantly space-saving and is more efficient to implement than it is possible with straight tubes.
Technical parameter of Fin Tube
Medium | air, flue gas, thermal oil, water, brine, refrigerant, etc. |
Temperature | standard heat exchanger to 560 ° C by special materials also higher |
Pipe materials |
carbon steel, stainless steel, alloy or special materials |
Ribs materials |
carbon steel, stainless steel, non-ferrous metal, alloy or special materials |
Thermal insulation &Surface treatment | according to customers specification |
Advantages of Fin Tube
Wide application and temperature spectrum (range)
Available as stainless steel finned tube heat exchanger
Many years of experience in various fields of application
Highest reliability of operation through extensive quality inspection
Fin Tube Workshop
Company Introduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
1. Fabrication area of 200,000 square meters
2. 150 Engineers
3. 600 Coded welders
4. 60 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization
MOQ: | 1 set |
Price: | Negotiable |
Standard Packaging: | Seaworthy Packing |
Delivery Period: | 30 - 60Days |
Payment Method: | L/C, T/T , Western Union |
Supply Capacity: | 500 Tons/Month |
High Efficient Finned Tube For Industrial Boiler Energy Saving Heating Surface
Product description of Fin Tube
Finned tube is a new kind of heat transfer material which has the feature of wearing resistance and high efficient.Finned tube heat exchanger for heat transfer between air, gas and liquids or steam. Heat exchanger with finned heating surfaces, so-called finned tube heat exchanger, offer the possibility of heat transfer between gases and liquids significantly space-saving and is more efficient to implement than it is possible with straight tubes.
Technical parameter of Fin Tube
Medium | air, flue gas, thermal oil, water, brine, refrigerant, etc. |
Temperature | standard heat exchanger to 560 ° C by special materials also higher |
Pipe materials |
carbon steel, stainless steel, alloy or special materials |
Ribs materials |
carbon steel, stainless steel, non-ferrous metal, alloy or special materials |
Thermal insulation &Surface treatment | according to customers specification |
Advantages of Fin Tube
Wide application and temperature spectrum (range)
Available as stainless steel finned tube heat exchanger
Many years of experience in various fields of application
Highest reliability of operation through extensive quality inspection
Fin Tube Workshop
Company Introduction
Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.
1. Fabrication area of 200,000 square meters
2. 150 Engineers
3. 600 Coded welders
4. 60 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization