SA210 Gr.C CFB Boiler Membrane Wall Panel with φ63.5×6mm Thick Wall Tube and Submerged Arc Welding
Product Details
| Tube Outer Diameter: | φ63.5mm | Tube Wall Thickness: | 6mm |
|---|---|---|---|
| Tube Material: | SA210 Gr.C | Membrane Bar Material: | Q245R Carbon Steel |
| Tube Pitch: | 100-120mm | Panel Width: | Customizable |
| Panel Length: | Up To 15000mm | Welding Method: | Submerged Arc Welding |
| Working Pressure: | Up To 12.7MPa | Application: | CFB Boiler Furnace, Erosion Zone |
| Highlight |
CFB Boiler Membrane Wall,φ63.5×6mm Thick Wall Panel,Circulating Fluidized Bed Tube |
||
Product Description
The SA210 Gr.C CFB Boiler Membrane Wall Panel is purpose-built for circulating fluidized bed (CFB) boilers, featuring φ63.5*6mm thick-wall SA210 Gr.C carbon steel tubes. This panel is engineered to withstand the intense erosive conditions created by high-velocity solid particle circulation in CFB furnace lower sections and refractory transition zones.
Fabricated from SA210 Gr.C medium carbon steel seamless tubes with industry-leading 6mm wall thickness. In CFB boilers, the dense bed region subjects water wall tubes to severe particle impingement erosion. The 6mm heavy wall design, combined with SA210 Gr.C's high tensile strength (≥485 MPa), provides extended service life in these aggressive environments. Q245R membrane bars are joined using submerged arc welding (SAW) for deep, consistent weld penetration across the full fin width.
- CFB-Optimized Design: φ63.5*6mm tube dimensions with 100-120mm tube pitch are specifically configured for CFB boiler heat transfer characteristics and erosion management
- Erosion Resistant: 6mm wall thickness provides substantial erosion allowance for the high particle loading conditions in CFB lower furnace zones, where bed material velocities exceed 5 m/s
- Metal Spray Coating Ready: Panel surface preparation compatible with thermal spray coating (HVOF) application for additional erosion protection in the most severe wear zones
- SAW Welded Membrane: Submerged arc welding delivers full penetration fin-to-tube bonds that resist crack propagation from erosive wear at the tube-fin interface
- Field Assembly Friendly: Pre-machined weld preparation on all panel edges reduces on-site welding time and improves field joint quality control
100% UT of tube butt welds and fin-to-tube bonds. Dimensional verification including tube straightness (<2mm/meter) and panel flatness. Hydrostatic testing at 1.5x design pressure. Full material certification per ASME/ASTM standards with heat number traceability.
| Parameter | Specification |
|---|---|
| Tube OD | φ63.5mm |
| Tube Wall Thickness | 6mm |
| Tube Material | SA210 Gr.C |
| Membrane Bar Material | Q245R |
| Tube Pitch | 100-120mm |
| Welding Method | Submerged arc welding |
| Standard | ASME Section I, GB/T 9222 |
Lower furnace water wall sections (dense bed zone), refractory-to-water-wall transition areas, and cyclone inlet/outlet duct panels in circulating fluidized bed boilers from 35 t/h to 1025 t/h capacity. Also applicable for bubbling fluidized bed (BFB) boiler furnace walls.
Product Highlights
SA210 Gr.C heavy-duty membrane wall panel with φ63.5×6mm thick wall tubes for circulating fluidized bed (CFB) boiler furnace sections. Enhanced erosion resistance for high-velocity solid particle environments.
High Pressure Power Boiler Heating Surface Membrane Wall Argon Arc Welding For Biomass Boiler
High Pressure Power Boiler Heating Surface Membrane Wall Argon Arc Welding For Biomass Boiler Product Introduction Water wall panels with pins usually laid vertically on the inner wall of the furnace wall, it is mainly used to absorb the radiant heat emitted by the flame and high-temperature flue gas in the furnace.It is the main type of evaporating heating surface of all kinds of modern boilers and the basic component of boiler water circulation loop.Because of both cooling
High Frequency Welding H Fin Tube Economizer For Power Plant Boiler ASME
High Frequency Welding H Fin Tube Economizer For Power Plant Boiler ASME Product Description The boiler economizer is a device used to recover waste heat in industrial boilers, usually located at the tail of the flue of the boiler, which increases the feed water temperature and reduces fuel consumption by absorbing the heat of the flue gas, so as to achieve the effect of energy saving and emission reduction. But at the same time, as an environmental protection equipment, the
Carbon Steel SA192 Superheater Coil Argon Arc Welding 100% PT
Product Description: A boiler superheater is an essential component in a boiler system, responsible for increasing the temperature of steam produced by the boiler. One of the key products in this category is the Superheater Coil, designed to enhance the efficiency and performance of boiler systems. This particular superheater is suitable for various fuels, including coal, oil, and biomass, making it versatile and adaptable to different energy sources. The Superheater Coil
Boiler Industrial SA210A1 Steel Boiler Economizer Heat Exchange Part ASME Certification
Boiler Industrial SA210A1 Steel Boiler Economizer Heat Exchange Part ASME Certification Introduction The H-shaped finned tube is also known as the H-shaped fin tube, also known as the butterfly fin tube. It is to weld symmetrically two pieces of steel with an arc in the middle to form fins (ribs or butterflies), the frontal shape of which resembles the letter "H", so it is called the H-shaped finned tube. The two fins of the H-shaped fin tube are rectangular and approximately
Please use our online inquiry contact form below if you have any questions, our team will get back to you as soon as possible.