logo
Products
PRODUCTS DETAILS
Home > Products >
Boiler Membrane Wall with 3mm Thickness and 500mm Width Made by Panel Bending Technique

Boiler Membrane Wall with 3mm Thickness and 500mm Width Made by Panel Bending Technique

MOQ: 30 tons
Price: Negotiable
Standard Packaging: Iron Frame Package sea worthy
Delivery Period: Within 95 Days after getting the DP or L/C
Payment Method: L/C,T/T
Supply Capacity: 600 Tons Per Month
Detail Information
Place of Origin
Zhangjiagang,China
Brand Name
HD BOILER
Certification
ISO9001 , EN3834 , ASME , BS, Grade A
Model Number
MWWPO1229
Material:
SA210C
Production Technique:
Panel Bending
Manufacturing Level:
ASME Standard
Range Of Applications:
Coal-fired Boilers
Structure:
Membrane Wall
Dimension Of Tube:
60mm*6mm
Highlight:

3mm Thickness Boiler Membrane Wall

,

500mm Width Boiler Membrane Wall

,

Panel Bending Boiler Membrane Wall

Product Description
Boiler Pipe Walls Made of Carbon Steel Tubes with Headers Assembly
Product Description
Water walls are heating components composed of multiple rows of steel pipes vertically arranged along the inner wall of boiler furnaces. They absorb high-temperature flame radiation heat to evaporate the working fluid inside the pipes while reducing furnace wall temperature. Available in three structural types:
  • Light tube type: Parallel-arranged seamless steel pipes
  • Membrane type: Welded fin sealed tube screens
  • Piercing tube type: Pin-installed pipes for refractory material application and heat absorption regulation
These components serve dual functions: initially for furnace cooling, now as core heat absorption elements capable of absorbing 40-50% of furnace heat in large boilers. Subcritical and higher parameter boilers require internally threaded pipes or Cr-Mo alloy steel pipes. Proper maintenance is essential to prevent external dust/slag accumulation and internal scaling, which can reduce heat transfer efficiency or cause pipe bursts. DC boiler water-cooled walls may use vertical tube screens or spiral tube coil structures, adaptable to varying heat loads through pipe diameter and material adjustments.
Key Advantages
  • Ensures furnace wall tightness, reducing combustion chamber air leakage
  • Fully water-cooled combustion chamber prevents coking during intense combustion
  • Low heat storage capacity enables rapid heating/cooling, shortening boiler start-up/shutdown cycles
  • Pipe-laying furnace wall design reduces boiler frame load and simplifies suspension
  • Enhanced heat absorption capacity compared to plain tubes
  • Improved pre-assembly capability reduces installation workload
Boiler Membrane Wall with 3mm Thickness and 500mm Width Made by Panel Bending Technique 0
Applications
Our HDB Membrane Wall provides excellent impact resistance as a boiler wall separator, effectively partitioning boiler walls. Constructed from stainless steel with 0.2MPa pressure rating and 1000mm length, its bolt connection system enables fast, easy installation. This solution reduces boiler wall damage risks from high temperature/pressure exposure while delivering superior sealing and insulation to minimize energy loss.
Customization Options
The HDB Boiler Membrane Wall features 3mm thickness, 500mm width, and polished surface finish, offering exceptional impact and heat resistance for diverse applications. This versatile solution is ideal for boiler wall separation requirements across various industrial settings.
Packaging & Shipping
Each Boiler Membrane Wall ships in protective cardboard packaging with:
  • Thick bubble wrap or equivalent protective wrapping
  • Secure box sealing with reinforced tape
  • Clear content labeling including weight and destination
  • Fragile handling indicators
  • Secondary shipping box for added transit protection
Manufacturer Profile
Hua Dong Boiler Co., Ltd. (established 1985) operates two manufacturing facilities spanning 400,000m² with $110 million USD in fixed assets. Our 1,100 employees include 150 technicians and 600 certified welders. Certifications include:
  • Chinese Grade A boiler and pressure vessel manufacturing licenses
  • ASME "S", "U", and "NB" stamps
  • ISO9001, SO3834, and EN12952 Quality Management Systems
Products
PRODUCTS DETAILS
Boiler Membrane Wall with 3mm Thickness and 500mm Width Made by Panel Bending Technique
MOQ: 30 tons
Price: Negotiable
Standard Packaging: Iron Frame Package sea worthy
Delivery Period: Within 95 Days after getting the DP or L/C
Payment Method: L/C,T/T
Supply Capacity: 600 Tons Per Month
Detail Information
Place of Origin
Zhangjiagang,China
Brand Name
HD BOILER
Certification
ISO9001 , EN3834 , ASME , BS, Grade A
Model Number
MWWPO1229
Material:
SA210C
Production Technique:
Panel Bending
Manufacturing Level:
ASME Standard
Range Of Applications:
Coal-fired Boilers
Structure:
Membrane Wall
Dimension Of Tube:
60mm*6mm
Minimum Order Quantity:
30 tons
Price:
Negotiable
Packaging Details:
Iron Frame Package sea worthy
Delivery Time:
Within 95 Days after getting the DP or L/C
Payment Terms:
L/C,T/T
Supply Ability:
600 Tons Per Month
Highlight

3mm Thickness Boiler Membrane Wall

,

500mm Width Boiler Membrane Wall

,

Panel Bending Boiler Membrane Wall

Product Description
Boiler Pipe Walls Made of Carbon Steel Tubes with Headers Assembly
Product Description
Water walls are heating components composed of multiple rows of steel pipes vertically arranged along the inner wall of boiler furnaces. They absorb high-temperature flame radiation heat to evaporate the working fluid inside the pipes while reducing furnace wall temperature. Available in three structural types:
  • Light tube type: Parallel-arranged seamless steel pipes
  • Membrane type: Welded fin sealed tube screens
  • Piercing tube type: Pin-installed pipes for refractory material application and heat absorption regulation
These components serve dual functions: initially for furnace cooling, now as core heat absorption elements capable of absorbing 40-50% of furnace heat in large boilers. Subcritical and higher parameter boilers require internally threaded pipes or Cr-Mo alloy steel pipes. Proper maintenance is essential to prevent external dust/slag accumulation and internal scaling, which can reduce heat transfer efficiency or cause pipe bursts. DC boiler water-cooled walls may use vertical tube screens or spiral tube coil structures, adaptable to varying heat loads through pipe diameter and material adjustments.
Key Advantages
  • Ensures furnace wall tightness, reducing combustion chamber air leakage
  • Fully water-cooled combustion chamber prevents coking during intense combustion
  • Low heat storage capacity enables rapid heating/cooling, shortening boiler start-up/shutdown cycles
  • Pipe-laying furnace wall design reduces boiler frame load and simplifies suspension
  • Enhanced heat absorption capacity compared to plain tubes
  • Improved pre-assembly capability reduces installation workload
Boiler Membrane Wall with 3mm Thickness and 500mm Width Made by Panel Bending Technique 0
Applications
Our HDB Membrane Wall provides excellent impact resistance as a boiler wall separator, effectively partitioning boiler walls. Constructed from stainless steel with 0.2MPa pressure rating and 1000mm length, its bolt connection system enables fast, easy installation. This solution reduces boiler wall damage risks from high temperature/pressure exposure while delivering superior sealing and insulation to minimize energy loss.
Customization Options
The HDB Boiler Membrane Wall features 3mm thickness, 500mm width, and polished surface finish, offering exceptional impact and heat resistance for diverse applications. This versatile solution is ideal for boiler wall separation requirements across various industrial settings.
Packaging & Shipping
Each Boiler Membrane Wall ships in protective cardboard packaging with:
  • Thick bubble wrap or equivalent protective wrapping
  • Secure box sealing with reinforced tape
  • Clear content labeling including weight and destination
  • Fragile handling indicators
  • Secondary shipping box for added transit protection
Manufacturer Profile
Hua Dong Boiler Co., Ltd. (established 1985) operates two manufacturing facilities spanning 400,000m² with $110 million USD in fixed assets. Our 1,100 employees include 150 technicians and 600 certified welders. Certifications include:
  • Chinese Grade A boiler and pressure vessel manufacturing licenses
  • ASME "S", "U", and "NB" stamps
  • ISO9001, SO3834, and EN12952 Quality Management Systems
Sitemap |  Privacy Policy | China Good Quality Superheater Coil Supplier. Copyright © 2017-2025 Zhangjiagang HuaDong Boiler Co., Ltd. . All Rights Reserved.