![]() |
MOQ: | 20 Tons |
Standard Packaging: | Steel Frame |
Delivery Period: | 60-150Days |
Payment Method: | L/C,T/T |
Type | Advantages | Disadvantages | Supporting Method |
---|---|---|---|
Pendant-type | 1. Firm structural support | 1. Flow blockage by condensed steam 2. Requires slow restart for water purging |
Supported from above |
Inverted-type | 1. Effective condensed steam drainage | 1. Reduced structural rigidity in high-speed gas flow | Supported from below |
Horizontal-type | 1. Excellent drainage 2. Superior structural rigidity |
1. Primarily convective type (no direct flame exposure) | Vertical gas duct mounting parallel to main furnace |
![]() |
MOQ: | 20 Tons |
Standard Packaging: | Steel Frame |
Delivery Period: | 60-150Days |
Payment Method: | L/C,T/T |
Type | Advantages | Disadvantages | Supporting Method |
---|---|---|---|
Pendant-type | 1. Firm structural support | 1. Flow blockage by condensed steam 2. Requires slow restart for water purging |
Supported from above |
Inverted-type | 1. Effective condensed steam drainage | 1. Reduced structural rigidity in high-speed gas flow | Supported from below |
Horizontal-type | 1. Excellent drainage 2. Superior structural rigidity |
1. Primarily convective type (no direct flame exposure) | Vertical gas duct mounting parallel to main furnace |