MOQ: | 20 |
Price: | $2,200-2,500 |
Description | Boiler economizer |
---|---|
Material | Alloy steel, Carbon steel, SA210C, SA213T22, etc. |
Material standard | ASTM, EN or ISO |
Dimension | Customized |
Weight | 10-1000 tons |
Smelting Process | EF+LF+VD |
Process | Material→Ingot→Hot/Cold-Rolling→Heat treatment→Inspection→Rough machining→UT→2nd Heat treatment→Finishing machining→Inspection |
UT standard | ASTM A388 or EN10228 |
MOQ: | 20 |
Price: | $2,200-2,500 |
Description | Boiler economizer |
---|---|
Material | Alloy steel, Carbon steel, SA210C, SA213T22, etc. |
Material standard | ASTM, EN or ISO |
Dimension | Customized |
Weight | 10-1000 tons |
Smelting Process | EF+LF+VD |
Process | Material→Ingot→Hot/Cold-Rolling→Heat treatment→Inspection→Rough machining→UT→2nd Heat treatment→Finishing machining→Inspection |
UT standard | ASTM A388 or EN10228 |