logo
products
PRODUCTS DETAILS
Home > Products >
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating

Power Station CFB Boiler Economizer with ASTM Certification for Central Heating

MOQ: 800
Price: $30
Detail Information
Place of Origin
Zhangjiagang,China
Brand Name
HD Boiler
Certification
ISO9001,ASME,Grade A,SGS,EN,TUV
Model Number
Economizer
Type:
Natural Circulation
Structure:
Fire Tube And Water Tube
Pressure:
Low / High Pressure
Style:
VERTICAL
Fuel:
Coal / Gas / Coal-fired / Water Heat
Output:
Hot Water / Steam
Weight:
20000 KG
Surface Treatment:
Painted
Bare Pipe OD:
25-1650 Mm
Bare Pipe Thickness:
2-40 Mm
Fin Thickness:
0.6-3.0 Mm
Fin Height:
5-30 Mm
Fin Tube Pitch:
5-30 Mm
Fin Tube Length:
≤12000 Mm
Material:
Carbon Steel, Alloy, Austenitic Steel
Highlight:

ASTM Certification Boiler Economizer

,

Central Heating CFB Boiler Economizer

,

Power Station Boiler Economizer

Product Description
Power Station CFB Boiler Economizer Central Heating ASTM Certification
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 0
Product Overview
The economizer is a mechanical heat exchange device designed to reduce energy consumption by preheating fluids. This unit is specifically engineered for power station CFB (Circulating Fluidized Bed) steam boiler applications, featuring central heating capabilities and ASTM certification.
Primary Function
The economizer significantly reduces operational costs by recovering waste heat to preheat boiler feedwater, thereby minimizing the energy required for steam generation while maintaining optimal system performance.
Technical Specifications
Parameter (Unit) Specification (mm)
Bare pipe (OD) 25-1650
Bare pipe (Thickness) 2-40
Fin (Thickness) 0.6-3.0
Fin (Height) 5-30
Fin tube thread pitch 5-30
Fin tube length ≤12000
Material: Carbon Steel, Alloy, Austenitic Steel (Nickel and Chromium or Manganese)
Quality Assurance
  • Impact test and strength calculation reports with complete materials documentation
  • 100% NDT (non-destructive testing) of all steel plates, tubes, and electrodes
  • Comprehensive weld inspection including X-ray, γ-ray, and liquid penetrant testing
  • Hydraulic pressure testing to verify working pressure standards and safety
Related Products
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 1
Company Profile
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 2
Packaging & Shipping
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 3
Frequently Asked Questions
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 4
products
PRODUCTS DETAILS
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating
MOQ: 800
Price: $30
Detail Information
Place of Origin
Zhangjiagang,China
Brand Name
HD Boiler
Certification
ISO9001,ASME,Grade A,SGS,EN,TUV
Model Number
Economizer
Type:
Natural Circulation
Structure:
Fire Tube And Water Tube
Pressure:
Low / High Pressure
Style:
VERTICAL
Fuel:
Coal / Gas / Coal-fired / Water Heat
Output:
Hot Water / Steam
Weight:
20000 KG
Surface Treatment:
Painted
Bare Pipe OD:
25-1650 Mm
Bare Pipe Thickness:
2-40 Mm
Fin Thickness:
0.6-3.0 Mm
Fin Height:
5-30 Mm
Fin Tube Pitch:
5-30 Mm
Fin Tube Length:
≤12000 Mm
Material:
Carbon Steel, Alloy, Austenitic Steel
Minimum Order Quantity:
800
Price:
$30
Highlight

ASTM Certification Boiler Economizer

,

Central Heating CFB Boiler Economizer

,

Power Station Boiler Economizer

Product Description
Power Station CFB Boiler Economizer Central Heating ASTM Certification
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 0
Product Overview
The economizer is a mechanical heat exchange device designed to reduce energy consumption by preheating fluids. This unit is specifically engineered for power station CFB (Circulating Fluidized Bed) steam boiler applications, featuring central heating capabilities and ASTM certification.
Primary Function
The economizer significantly reduces operational costs by recovering waste heat to preheat boiler feedwater, thereby minimizing the energy required for steam generation while maintaining optimal system performance.
Technical Specifications
Parameter (Unit) Specification (mm)
Bare pipe (OD) 25-1650
Bare pipe (Thickness) 2-40
Fin (Thickness) 0.6-3.0
Fin (Height) 5-30
Fin tube thread pitch 5-30
Fin tube length ≤12000
Material: Carbon Steel, Alloy, Austenitic Steel (Nickel and Chromium or Manganese)
Quality Assurance
  • Impact test and strength calculation reports with complete materials documentation
  • 100% NDT (non-destructive testing) of all steel plates, tubes, and electrodes
  • Comprehensive weld inspection including X-ray, γ-ray, and liquid penetrant testing
  • Hydraulic pressure testing to verify working pressure standards and safety
Related Products
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 1
Company Profile
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 2
Packaging & Shipping
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 3
Frequently Asked Questions
Power Station CFB Boiler Economizer with ASTM Certification for Central Heating 4
Sitemap |  Privacy Policy | China Good Quality Superheater Coil Supplier. Copyright © 2017-2025 Zhangjiagang HuaDong Boiler Co., Ltd. . All Rights Reserved.