|
|
| MOQ: | 30 tons |
| Price: | Negotiable |
| Standard Packaging: | Iron Frame Package sea worthy |
| Delivery Period: | Within 95 Days after getting the DP or L/C |
| Payment Method: | L/C,T/T |
| Supply Capacity: | 600 Tons Per Month |
| Attribute | Value |
|---|---|
| Material | Carbon Steel/Alloy Steel |
| Color | Red/blue/black |
| Manufacturing Level | ASME Standard |
| Range of Applications | Biomass Boiler |
| Specification | As per the drawing |
| Structure | Membrane wall |
| Port | Shanghai, Zhangjiagang |
|
|
| MOQ: | 30 tons |
| Price: | Negotiable |
| Standard Packaging: | Iron Frame Package sea worthy |
| Delivery Period: | Within 95 Days after getting the DP or L/C |
| Payment Method: | L/C,T/T |
| Supply Capacity: | 600 Tons Per Month |
| Attribute | Value |
|---|---|
| Material | Carbon Steel/Alloy Steel |
| Color | Red/blue/black |
| Manufacturing Level | ASME Standard |
| Range of Applications | Biomass Boiler |
| Specification | As per the drawing |
| Structure | Membrane wall |
| Port | Shanghai, Zhangjiagang |