![]() |
MOQ: | 30 tons |
Price: | Negotiable |
Standard Packaging: | Iron Frame Package sea worthy |
Delivery Period: | Within 95 Days after getting the DP or L/C |
Payment Method: | L/C,T/T |
Supply Capacity: | 600 Tons Per Month |
Attribute | Value |
---|---|
Material | Carbon Steel/Alloy Steel |
Color | Red/blue/black |
Manufacturing Level | ASME Standard |
Range of Applications | Biomass Boiler |
Specification | As per the drawing |
Structure | Membrane wall |
Port | Shanghai, Zhangjiagang |
![]() |
MOQ: | 30 tons |
Price: | Negotiable |
Standard Packaging: | Iron Frame Package sea worthy |
Delivery Period: | Within 95 Days after getting the DP or L/C |
Payment Method: | L/C,T/T |
Supply Capacity: | 600 Tons Per Month |
Attribute | Value |
---|---|
Material | Carbon Steel/Alloy Steel |
Color | Red/blue/black |
Manufacturing Level | ASME Standard |
Range of Applications | Biomass Boiler |
Specification | As per the drawing |
Structure | Membrane wall |
Port | Shanghai, Zhangjiagang |