Send Message
Home ProductsSuperheater Coil

Effective Heat Exchanger For Hot Water / Steam Output Placed Before ESP Or Before FGD

Effective Heat Exchanger For Hot Water / Steam Output Placed Before ESP Or Before FGD

  • Effective Heat Exchanger For Hot Water / Steam Output Placed Before ESP Or Before FGD
  • Effective Heat Exchanger For Hot Water / Steam Output Placed Before ESP Or Before FGD
  • Effective Heat Exchanger For Hot Water / Steam Output Placed Before ESP Or Before FGD
  • Effective Heat Exchanger For Hot Water / Steam Output Placed Before ESP Or Before FGD
Effective Heat Exchanger For Hot Water / Steam Output Placed Before ESP Or Before FGD
Product Details:
Place of Origin: China
Brand Name: HD Boiler
Certification: ASME, ISO9001:2015, ISOEN3834
Model Number: Boiler Superheater
Payment & Shipping Terms:
Minimum Order Quantity: 3 TONS
Price: negotiable
Packaging Details: Iron frame Packing
Delivery Time: Depands on Qty
Payment Terms: 30% after contract and balance 70% before shipment, or 100% L/C at sight
Supply Ability: 100 tons/Month
Contact Now
Detailed Product Description
Application: Boiler System Operation: Natural Circulation/Force Cirulation
Packing: Iron Frame Package Output: Hot Water / Steam
Usage: Power Station Material: Carbon Steel
Boiler Capacity: 1T-10T Design Pressure: 1-10MPa
High Light:

Steam Output Heat Exchanger

,

Effective Heat Exchanger

,

Heat Exchanger For Hot Water

Product Description:

(1) HDB consistently executes successful boiler economizer installations using safe, cost-effective methods. Economizers improve boiler performance by increasing fuel efficiency and improving steam generation and response time.

 

(2) We can guide you through the process of installing or retrofitting existing boiler systems .

Our expert boiler economizer and waste heat recovery system installations can reduce your overall fuel requirements, lower emissions, and ultimately reduce your boiler operating costs.

 


Details


• Superheating raises overall efficiency as well as avoids too much condensation in last stages of turbine which avoids blade erosion.
The heat of combustion gases from furnace is utilised for removal of moisture from steam and to superheat the steam.
Super-heaters ususlly have several tube circuits in parallel with one or more return bends,connected between headers.
Heat from the hot gases to the vapour in the surperheater is transferred at high temperatures.
Therefore promary section of superheater is arranged in counterflow and secondary section in parallel flow to reduce the temp.stressing of the tube wall.

Differences

Type Advantages Disadvantages Supporting method
Pendant-type 1.Firm structural support 1. Flow blockage by condensed steam 2. Needs slow restart to purge the water that accumulates in the bottom. supported from above
Inverted-type 1.Proper drainage of the condensed steam 1. Lack the structural rigidity, especially in high speed gas flow Supported from below
Horizontal -type

1. Proper drainage

2. Good structural rigidity.

1. They do not view the flam directly so they are mainly from the convective type Usually supported in the vertical gas ducts parallel to the main furnace.

Effective Heat Exchanger For Hot Water / Steam Output Placed Before ESP Or Before FGD 0

FAQ:

  • Q: What is the brand name of this product?
    A: The brand name of this product is HD Boiler.
  • Q: What is the model number of this product?
    A: The model number of this product is Boiler economizer.
  • Q: Where is this product manufactured?
    A: This product is manufactured in China.
  • Q: What certifications does this product have?
    A: This product is certified by ASME, ISO9001:2015, and ISOEN3834.
  • Q: What is the minimum order quantity for this product?
    A: The minimum order quantity for this product is 3 tons.
  • Q: Is the price of this product negotiable?
    A: Yes, the price of this product is negotiable.
  • Q: How is this product packaged?
    A: This product is packaged in iron frames.
  • Q: How long is the delivery time for this product?
    A: The delivery time for this product depends on the quantity ordered.
  • Q: What are the payment terms for this product?
    A: The payment terms for this product are 30% after contract and balance 70% before shipment, or 100% L/C at sight.
  • Q: What is the supply ability of this product?
    A: The supply ability of this product is 100 tons per month.

Contact Details
Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Person: Miss. Sandy Chen

Fax: 86- 512-58774453

Send your inquiry directly to us (0 / 3000)

Contact

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China