Place of Origin: | China |
Brand Name: | HD BOILER |
Certification: | ISO9001 , SGS , TUV , ASME , EN |
Model Number: | economizer |
Minimum Order Quantity: | 1 Set |
---|---|
Price: | Negotiable |
Packaging Details: | Seaworthy packing |
Delivery Time: | 50 Days |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 500 Tons / Month |
Material: | Carbon Steel,Alloy,Stainless Steel | Surface Treatment: | Painted |
---|---|---|---|
HS Code: | 3215960855 | Packaging: | Iron Frame Packing |
Available: | Energy Saving | Color: | Red / Grey Other Color |
Condition: | New | Specification: | Customized |
High Light: | Coal Fired steam boiler economizer,165mm steam boiler economizer,165mm steam economizer |
HD Boiler Co.,ltd Boiler-based Spare Parts economizer for Coal Fired Power Plant/ carbon steel
Product Description
Economizers (US and Oxford spelling), or economisers (UK), are mechanical devices intended to reduce energy consumption, or to perform useful function such as preheating a fluid. The term economizer is used for other purposes as well. Boiler, power plant, heating, refrigeration, ventilating, and air conditioning (HVAC) uses are discussed in this article. In simple terms, an economizer is a heat exchanger.
Specification
|
Functions
1. fuel saving: the economizers are placed at the rear part of boilers. This way can decrease the smoke and gas temperatures, thus to save fuels.
2.improve the working conditions of steam drums: due to economizers, the feed water temperature is increased when entering the steam drum. It reduces the temperature difference between the feed water and steam drum wall as well as steam drum thermal stress, so that it improve the working conditions of steam drums and increase the service life.
3.reduce the boiler manufacturing cost: for the feed water is heated in the boiler economizers. The use of low temperature spare parts as boiler economizers to replace some of high-priced high temperature water wall panels reduces the cost to manufacture boilers.
Certification
Quality Control
1. Fabrication area of 200,000 square meters
2. 150 Engineers
3. 600 Coded welders
4. 60 Licensed Inspectors(NDT Level-III instructors)
5. Class-A Licenses for Design and Manufacture Boiler
6. ISO 9001:2008 Quality System
7. ASME Certificate of Power Boilers
8. ASME 'S','U' and NB stamp authorization
Company
Contact Person: Miss. Sandy Chen
Fax: 86- 512-58774453
Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China