Send Message
products
PRODUCTS DETAILS
Home > Products >
Hi Frequency Welding Industrial Boiler Fin Tube For Power Plant ASME Standard

Hi Frequency Welding Industrial Boiler Fin Tube For Power Plant ASME Standard

MOQ: 1 set
Price: Negotiable
Standard Packaging: Iron Frame Packing
Delivery Period: 50 Days
Payment Method: Western Union
Supply Capacity: 1200 Tons Per Month
Detail Information
Place of Origin
China
Brand Name
HD BOILER
Certification
ISO9001 , SGS , TUV , ASME , EN
Model Number
Spiral/H TYPE
Standard:
ASME
Material:
Stainless Steel / ND Steel / Carbon Steel / Alloy Steel
Bare Tube:
Cold Finished
Welding:
High Frequency Welding
Type:
Boiler Part
Specification:
Customized
Highlight:

spiral fin tube

,

heat exchanger fin tube

Product Description

 

High Frequency Welding Fin Tube For Power Plant Industrial Boiler ASME Standard

 

Introduction

 

  • 1. Economiser performs a key function in providing high overall boiler thermal efficiency by recovering the low level energy from the flue gas before it is exhausted to the atmosphere.

 

  • 2. Economiser recovers the energy by heating the boiler feedwater.

 

  • 3. Economiser are basically tubular heat transfer surfaces used to preheat boiler feed water before it enters the steam drum or furnace surfaces.

 

  • 4. Economiser reduces operating costs or economise on fuel by recovering extra energy from the flue gas.

 

  • 5. Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn't exceed the boiling purpose of liquid.

 

  • 6. We can manufacture three types of boiler economizer, bare tube economzier, H finned tube economzier and spiral finned tube economzier.

 

Procedure

 

1 Economisers also reduce the potential of thermal shock and strong water temperature fluctuations as the feed water enters the drum or waterwalls.
2 Increasingly stringent environmental regulations limiting nitrogen oxides and sulfur dioxide emission can also affect economizer design.
3 The gas-side heat transfer coefficient is much less than water side heat transfer coefficient. To compensate this, outer surface of the tubes may be finned to increase the surface area of heat transfer.
4 The ultimate goal of economizer design is to achieve the necessary heat transfer at minimum cost.
5 A key design criterion for economizer is maximum allowable flue gas velocity. Higher velocity provide better heat transfer and reduce capital cost.

 

Specifications

 

Name(unit) Specification(mm)
Bare pipe(OD) 25-1650
Bare pipe(Thickness) 2-40
Fin (Thickness) 0.6-3.0
Fin (Height) 5-30
Fin tube thread pitch 5-30
Fin tube length ≤12000

Material:Carbon Steel,Alloy,Austenitic Steel(Nickel and Chromium or Manganese)

 

Quality Control

 

1 Impact test and Strength calculation report with applied materials information.
2 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.
3 X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler.
4 Hydraulic test report: ensure the standard working pressure and safety.

 

 

Hi Frequency Welding Industrial Boiler Fin Tube For Power Plant ASME Standard 0

 

Company Introduction


For over 30years, Hua Dong Boiler has been consistently innovating and improving our boiler superheaters and reheaters.The improvements in bending,welding and design ensure our products meet both Euorpean and American standards, ensuring a relabile performance..

products
PRODUCTS DETAILS
Hi Frequency Welding Industrial Boiler Fin Tube For Power Plant ASME Standard
MOQ: 1 set
Price: Negotiable
Standard Packaging: Iron Frame Packing
Delivery Period: 50 Days
Payment Method: Western Union
Supply Capacity: 1200 Tons Per Month
Detail Information
Place of Origin
China
Brand Name
HD BOILER
Certification
ISO9001 , SGS , TUV , ASME , EN
Model Number
Spiral/H TYPE
Standard:
ASME
Material:
Stainless Steel / ND Steel / Carbon Steel / Alloy Steel
Bare Tube:
Cold Finished
Welding:
High Frequency Welding
Type:
Boiler Part
Specification:
Customized
Minimum Order Quantity:
1 set
Price:
Negotiable
Packaging Details:
Iron Frame Packing
Delivery Time:
50 Days
Payment Terms:
Western Union
Supply Ability:
1200 Tons Per Month
Highlight

spiral fin tube

,

heat exchanger fin tube

Product Description

 

High Frequency Welding Fin Tube For Power Plant Industrial Boiler ASME Standard

 

Introduction

 

  • 1. Economiser performs a key function in providing high overall boiler thermal efficiency by recovering the low level energy from the flue gas before it is exhausted to the atmosphere.

 

  • 2. Economiser recovers the energy by heating the boiler feedwater.

 

  • 3. Economiser are basically tubular heat transfer surfaces used to preheat boiler feed water before it enters the steam drum or furnace surfaces.

 

  • 4. Economiser reduces operating costs or economise on fuel by recovering extra energy from the flue gas.

 

  • 5. Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn't exceed the boiling purpose of liquid.

 

  • 6. We can manufacture three types of boiler economizer, bare tube economzier, H finned tube economzier and spiral finned tube economzier.

 

Procedure

 

1 Economisers also reduce the potential of thermal shock and strong water temperature fluctuations as the feed water enters the drum or waterwalls.
2 Increasingly stringent environmental regulations limiting nitrogen oxides and sulfur dioxide emission can also affect economizer design.
3 The gas-side heat transfer coefficient is much less than water side heat transfer coefficient. To compensate this, outer surface of the tubes may be finned to increase the surface area of heat transfer.
4 The ultimate goal of economizer design is to achieve the necessary heat transfer at minimum cost.
5 A key design criterion for economizer is maximum allowable flue gas velocity. Higher velocity provide better heat transfer and reduce capital cost.

 

Specifications

 

Name(unit) Specification(mm)
Bare pipe(OD) 25-1650
Bare pipe(Thickness) 2-40
Fin (Thickness) 0.6-3.0
Fin (Height) 5-30
Fin tube thread pitch 5-30
Fin tube length ≤12000

Material:Carbon Steel,Alloy,Austenitic Steel(Nickel and Chromium or Manganese)

 

Quality Control

 

1 Impact test and Strength calculation report with applied materials information.
2 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.
3 X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler.
4 Hydraulic test report: ensure the standard working pressure and safety.

 

 

Hi Frequency Welding Industrial Boiler Fin Tube For Power Plant ASME Standard 0

 

Company Introduction


For over 30years, Hua Dong Boiler has been consistently innovating and improving our boiler superheaters and reheaters.The improvements in bending,welding and design ensure our products meet both Euorpean and American standards, ensuring a relabile performance..

Sitemap |  Privacy Policy | China Good Quality Superheater Coil Supplier. Copyright © 2017-2024 Zhangjiagang HuaDong Boiler Co., Ltd. . All Rights Reserved.