MOQ: | 1 set |
Price: | Negotiable |
Standard Packaging: | Iron Frame Packing |
Delivery Period: | 50 Days |
Payment Method: | Western Union |
Supply Capacity: | 1200 Tons Per Month |
High Frequency Welding Fin Tube For Power Plant Industrial Boiler ASME Standard
Introduction
Procedure
1 | Economisers also reduce the potential of thermal shock and strong water temperature fluctuations as the feed water enters the drum or waterwalls. |
2 | Increasingly stringent environmental regulations limiting nitrogen oxides and sulfur dioxide emission can also affect economizer design. |
3 | The gas-side heat transfer coefficient is much less than water side heat transfer coefficient. To compensate this, outer surface of the tubes may be finned to increase the surface area of heat transfer. |
4 | The ultimate goal of economizer design is to achieve the necessary heat transfer at minimum cost. |
5 | A key design criterion for economizer is maximum allowable flue gas velocity. Higher velocity provide better heat transfer and reduce capital cost. |
Specifications
Name(unit) | Specification(mm) |
Bare pipe(OD) | 25-1650 |
Bare pipe(Thickness) | 2-40 |
Fin (Thickness) | 0.6-3.0 |
Fin (Height) | 5-30 |
Fin tube thread pitch | 5-30 |
Fin tube length | ≤12000 |
Material:Carbon Steel,Alloy,Austenitic Steel(Nickel and Chromium or Manganese)
Quality Control
1 | Impact test and Strength calculation report with applied materials information. |
2 | 100%NDT(non-destructive inspection) report of steel plate, tube and electrode. |
3 | X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler. |
4 | Hydraulic test report: ensure the standard working pressure and safety. |
Company Introduction
For over 30years, Hua Dong Boiler has been consistently innovating and improving our boiler superheaters and reheaters.The improvements in bending,welding and design ensure our products meet both Euorpean and American standards, ensuring a relabile performance..
MOQ: | 1 set |
Price: | Negotiable |
Standard Packaging: | Iron Frame Packing |
Delivery Period: | 50 Days |
Payment Method: | Western Union |
Supply Capacity: | 1200 Tons Per Month |
High Frequency Welding Fin Tube For Power Plant Industrial Boiler ASME Standard
Introduction
Procedure
1 | Economisers also reduce the potential of thermal shock and strong water temperature fluctuations as the feed water enters the drum or waterwalls. |
2 | Increasingly stringent environmental regulations limiting nitrogen oxides and sulfur dioxide emission can also affect economizer design. |
3 | The gas-side heat transfer coefficient is much less than water side heat transfer coefficient. To compensate this, outer surface of the tubes may be finned to increase the surface area of heat transfer. |
4 | The ultimate goal of economizer design is to achieve the necessary heat transfer at minimum cost. |
5 | A key design criterion for economizer is maximum allowable flue gas velocity. Higher velocity provide better heat transfer and reduce capital cost. |
Specifications
Name(unit) | Specification(mm) |
Bare pipe(OD) | 25-1650 |
Bare pipe(Thickness) | 2-40 |
Fin (Thickness) | 0.6-3.0 |
Fin (Height) | 5-30 |
Fin tube thread pitch | 5-30 |
Fin tube length | ≤12000 |
Material:Carbon Steel,Alloy,Austenitic Steel(Nickel and Chromium or Manganese)
Quality Control
1 | Impact test and Strength calculation report with applied materials information. |
2 | 100%NDT(non-destructive inspection) report of steel plate, tube and electrode. |
3 | X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler. |
4 | Hydraulic test report: ensure the standard working pressure and safety. |
Company Introduction
For over 30years, Hua Dong Boiler has been consistently innovating and improving our boiler superheaters and reheaters.The improvements in bending,welding and design ensure our products meet both Euorpean and American standards, ensuring a relabile performance..