MOQ: | 1 set |
Price: | Negoyiable |
Standard Packaging: | Iron Frame Packing |
Delivery Period: | 30~50 days |
Payment Method: | L/C, T/T, Western Union |
Supply Capacity: | 500 tons per month |
Excellent Testing System Heat Recovery Steam Generator for Industry Usage
What is HRSG?
What is working principle of HRSG?
What are the features of HRSG?
What are the specifications of HRSG?
Cement production line capacity t/d | 1000 | 2500 | 5000 | 10000 | |
Boiler inlet flow Nm3/h | Kiln(front) | 60000 | 88000 | 243000 | 472000 |
Kiln(tail) | 76000 | 170000 | 328000 | 612000 | |
Boiler inlet gas temperature℃ | Kiln(front) | 370 | 360 | 380 | 390 |
Kiln(tail) | 360 | 320~360 | 330 | 330 | |
Rated evaporation t/h | Kiln(front) | 5.8 | 7.25 | 24 | 50 |
Kiln(tail) | 7.5 | 10~15.8 | 20~24.6 | 35.5 | |
Rated steam pressure Mpa | Kiln(front) | 1.25 | 1.25 | 1.25 | 1.25 |
Kiln(tail) | 1.25 | 1.25 | 1.25 | 1.25 | |
Rated steam temperature℃ | Kiln(front) | 340 | 330 | 350 | 360 |
Kiln(tail) | 340 | 300~340 | 310 | 310 | |
Boiler structure | Kiln(front) | Vertical | Vertical | Vertical | Vertical |
Kiln(tail) | Vertical | Vertical and Horizontal | Vertical and Horizontal | Vertica |
Why do you choose HDB?
Certificate
How to contact us?
Web:① www.boilerfabrication.com ② hdboilerparts.fr
③http://hdboilerparts.fr/ (Frenchweb)
Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
MOQ: | 1 set |
Price: | Negoyiable |
Standard Packaging: | Iron Frame Packing |
Delivery Period: | 30~50 days |
Payment Method: | L/C, T/T, Western Union |
Supply Capacity: | 500 tons per month |
Excellent Testing System Heat Recovery Steam Generator for Industry Usage
What is HRSG?
What is working principle of HRSG?
What are the features of HRSG?
What are the specifications of HRSG?
Cement production line capacity t/d | 1000 | 2500 | 5000 | 10000 | |
Boiler inlet flow Nm3/h | Kiln(front) | 60000 | 88000 | 243000 | 472000 |
Kiln(tail) | 76000 | 170000 | 328000 | 612000 | |
Boiler inlet gas temperature℃ | Kiln(front) | 370 | 360 | 380 | 390 |
Kiln(tail) | 360 | 320~360 | 330 | 330 | |
Rated evaporation t/h | Kiln(front) | 5.8 | 7.25 | 24 | 50 |
Kiln(tail) | 7.5 | 10~15.8 | 20~24.6 | 35.5 | |
Rated steam pressure Mpa | Kiln(front) | 1.25 | 1.25 | 1.25 | 1.25 |
Kiln(tail) | 1.25 | 1.25 | 1.25 | 1.25 | |
Rated steam temperature℃ | Kiln(front) | 340 | 330 | 350 | 360 |
Kiln(tail) | 340 | 300~340 | 310 | 310 | |
Boiler structure | Kiln(front) | Vertical | Vertical | Vertical | Vertical |
Kiln(tail) | Vertical | Vertical and Horizontal | Vertical and Horizontal | Vertica |
Why do you choose HDB?
Certificate
How to contact us?
Web:① www.boilerfabrication.com ② hdboilerparts.fr
③http://hdboilerparts.fr/ (Frenchweb)
Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China