Send Message
Home ProductsBoiler Fin Tube

Aluminum Stainless Steel Welding Finned Tube , Fin Tube Heater 1 Year Warranty

Aluminum Stainless Steel Welding Finned Tube , Fin Tube Heater 1 Year Warranty

  • Aluminum Stainless Steel Welding Finned Tube , Fin Tube Heater 1 Year Warranty
  • Aluminum Stainless Steel Welding Finned Tube , Fin Tube Heater 1 Year Warranty
  • Aluminum Stainless Steel Welding Finned Tube , Fin Tube Heater 1 Year Warranty
Aluminum Stainless Steel Welding Finned Tube , Fin Tube Heater 1 Year Warranty
Product Details:
Place of Origin: CHINA
Brand Name: HD Boiler
Certification: ISO9001 , SGS , TUV , ASME , EN
Model Number: Boiler Fin Tube
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Iron Frame Packing
Delivery Time: 50-80 days
Payment Terms: L/C, Western Union, T/T
Supply Ability: 600 ton per month
Contact Now
Detailed Product Description
Fin Material: Aluminum,304L/316LStainless Steel Material: Carbon Steel,304
Voltage: 380V/50HZ,120V-240V Name: ASTM A179 Boiler Heat Exchanger Aluminum Fin Tube
Warranty: 1 Year Packing: Seaworthy Packing Of Fin Tube
High Light:

spiral fin tube

,

heat exchanger fin tube

 

Aluminum , Stainless Steel Welding Finned Tubes For High Efficient Heat Transfer

 

Introduction of Product

Compared to the traditional fin tube or spiral tube,the H-fin tube can greatly expand the heating surface.H-fin Tubes have two steel discs,with fluorescent tubes symmetrically welded together to form fins(fins of butterfly piece)creating a shape that looks somewhat like the letter"H",creating an efficient energy saving, extension heating surface.

 

Standard: ASME Standard Or GB Material: ND Steel / Carbon Steel / Alloy Steel Etc
Bare Tube: Cold Finished Shipment: Container
Type: Boiler Part Specification: Customized
Surface Treatment: Painted Packing: Iron Frame Package

 

Features

1. Reduced dust accumulation

Ash formation occurs on the pipe's back and windward sides.It is easy to scour the pipe by disarrangement, and less dust accumulates on the back.As for the pipe arrangement in sequence, due to the fact that the air flow is not easy to flush the back of the pipe, there is more ash accumulation in the pipe arrangement in sequence than in the wrong column.

The h-type fin is welded on both sides of the pipe, which does not accumulate ash, while the air flow flows straight, the air flow direction does not change, and the fin does not accumulate ash.

A gap of 4-10 is left in the middle of the h-type fin, which can guide the air flow to sweep the pipe fin to accumulate dust.

As the spiral Angle of the fin guides the flow direction, the ash accumulation of the fin tube is more serious, and the economizer which does not form loose ash cannot be used.Field operation shows that the h-shaped fin tube does not accumulate ash, while the spiral fin is seriously.

The longitudinal fin tube is formed by the flow of air along the fin as the fin is welded on the surface and back of the accumulated ash.Some areas are prone to dust accumulation.

The h-shaped fin, which forms a straight channel on both sides, has the best blowing effect.

2. Compact space and low cost

The pipe set is much compact and reduces the height of tail smoke well.

The total weight is greatly reduced and the load of the suspension system is reduced.

Reduce cost of economizer and integral boiler.

 

Company Profile

Hua Dong Boiler Co., Ltd. is a high-tech enterprise specialized in manufacturing boilers. Established in early 1985s, has two manufacturing bases, this company covers 400,000 ㎡ with fixed assets amounting to USD 110,000,000. There are 1100 employees including 150 technicians and 600 coded welders. Hua Dong holds the manufacturing licenses for Grade A boilers and Grade A1&A2 pressure vessels issued by Chinese General Administration of Quality Supervision, Inspection and Quarantine; also it holds the "S" and "U" "NB" stamps issued by American Society of Mechanical Engineers; meanwhile, this Company has passed the certification of ISO9001, SO3834, EN12952 Quality Management System.Aluminum Stainless Steel Welding Finned Tube , Fin Tube Heater 1 Year Warranty 0

Contact Details
Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Person: Miss. Sandy Chen

Fax: 86- 512-58774453

Send your inquiry directly to us (0 / 3000)

Other Products

Contact

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China