Home ProductsBoiler Manifold Headers

Power Station Plant Boiler Manifold Headers For Oil Fired Boiler Parts

Power Station Plant Boiler Manifold Headers For Oil Fired Boiler Parts

    • Power Station Plant Boiler Manifold Headers For Oil Fired Boiler Parts
    • Power Station Plant Boiler Manifold Headers For Oil Fired Boiler Parts
    • Power Station Plant Boiler Manifold Headers For Oil Fired Boiler Parts
    • Power Station Plant Boiler Manifold Headers For Oil Fired Boiler Parts
  • Power Station Plant Boiler Manifold Headers For Oil Fired Boiler Parts

    Product Details:

    Place of Origin: Zhangjiagang,Jiangsu,China
    Brand Name: HD Boiler
    Certification: ISO9001/SGS/TUV/ASME/EN
    Model Number: Header

    Payment & Shipping Terms:

    Minimum Order Quantity: 1Set
    Price: Negotiable
    Packaging Details: Seaworthy Packing
    Delivery Time: 30 Days
    Payment Terms: L/C, T/T, Western Union, D/P, MoneyGram
    Supply Ability: 100 Tons/Month
    Contact Now
    Detailed Product Description
    Condition: New Structure: Fire/Water Tube
    Fuel: Coal/Gas/Coal-fired/Water Heat Type: Boiler Part
    Pressure: Low/High Pressure Range Of Applications: Industrial/Power Station
    Specification: Customized Surface Treatment: Customized
    High Light:

    boiler header manifolds

    ,

    headers and manifolds

     

    Power Station Plant Boiler Manifold Headers For Oil Fired Boiler Parts

     

     

     

     

    Product Introduce


    In order to improve the efficiency of the boiler, the tubular boiler is gradually developed into a tubular boiler to increase the heat transfer area. The water in the pot flows into the lower box through the down pipe, and is distributed to each tube bundle. The water in the tube bundle continuously absorbs heat energy, which is collected in the upper box and then flows back into the pot barrel. We refer to the upper and lower boxes as boxes or boxes. Header box (also called header box) is an important part of boiler, divided into upper header box and lower header box.

     

    Power Station Plant Boiler Manifold Headers For Oil Fired Boiler Parts 0

     

     

    Materials


    The header is consisted of header body, end cover, tube joint, hand hole, thermometer socket and so on. And the welding checking is strictly proceeded as the welding process to guarantee 100% qualified products.

     

     

    Product Parameters


     

    Structure header body, end cover, tube joint, hand cole, thermometer socket
    Characteristics advanced welding, high automation degree, safe and reliable operation

     

    Power Station Plant Boiler Manifold Headers For Oil Fired Boiler Parts 1

     

     

    Product Functions


    The collecting box is the pipe fitting for boiler working medium mixing and ensuring uniform heating of working medium. Industrial boiler furnace wall is usually composed of rows and rows of tubes (water wall) together, but boiler huge volume, complicated structure, cannot guarantee that all the working medium in the pipe of heat absorption capacity is the same, different parts of heat absorption differs a lot, install header can let each pipe working medium inside converge here, the redistribution to the next level in the tube, so that we can reduce the thermal deviation, make the working medium heat, cooling flow, boiler, the boiler thermal efficiency are optimized to improve; In addition, the size, quantity and arrangement of pipes in the upper, middle and lower parts of the boiler are different, and the collecting box is responsible for connecting each section to ensure the smooth flow of working quality.

     

     

    Features


    1. Strength calculation report with applied materials information;
    2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod;
    3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler;
    4. Hydraulic test report: ensure the standard working pressure and safet

     

     

    Workshop


     

    Power Station Plant Boiler Manifold Headers For Oil Fired Boiler Parts 2

     

     

    HD Boiler offers a best in class facility,including


    • Fabrication area of 200,000 square meters
    • 150 Engineers
    • 600 Coded welders
    • 60 Licensed Inspectors (including NDT level-lll instructors)
    • Grade-ALicenses for Design and Manufacture boiler (issued by the State Administration of Quality Supervision and Inspection)
    • ISO 90001:2008 Quality System
    • ASME Certificate of Utility Boiler
    • ASME‘S’ , ‘U’ and NB stamp authorization

    Contact Details
    Zhangjiagang HuaDong Boiler Co., Ltd.

    Contact Person: Steven

    Send your inquiry directly to us (0 / 3000)

    Contact

    Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

    Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China