Send Message
products
PRODUCTS DETAILS
Home > Products >
Power Plant Boiler Manifold Headers ASME standard Boiler Parts

Power Plant Boiler Manifold Headers ASME standard Boiler Parts

MOQ: 1 Set
Price: Negotiable
Standard Packaging: Iron Frame Package
Delivery Period: 30 working days
Payment Method: L/C, T/T
Supply Capacity: 500 tons/month
Detail Information
Place of Origin
Jiangsu , China
Brand Name
HDB
Certification
ISO9001 , SGS , TUV , ASME , EN
Model Number
Boiler Manifold Header
Condition:
New
Working Temperature:
445 Degree
Application:
Power Station
Material:
Carbon Steel,Stainless Steel
OEM:
Yes
Color:
Customized
High Light:

header in boiler

,

headers and manifolds

Product Description
 
 
Power Plant Boiler Manifold Headers ASME standard Boiler Parts
 
 
Product Description of Manifold Headers

In manufacturing, the key of end cover hinder is welding. Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
 
When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers. Such welding methods have high manufacturing efficiency, good quality, beautiful welding shape, safety, reliability, etc.
Material Carbon steel,Alloy steel,Stainless steel.
Length According to costumes requirements.
Temperature Range 300℃~1500℃
Diameter(OD) 76mm~914mm

 

 

Details of Manifold Headers


1.The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.

 

2.In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.

 

Features of Manifold Headers


1. Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.

5.Excellent in welding quality, highly automatic, safe and reliable.

 

Power Plant Boiler Manifold Headers ASME standard Boiler Parts 0

 

Classification of Manifold Headers


 

1 Headers form an important part of all types of boilers.
2 Steam from the generating tubes is collected in headers which are therefore always under pressure.
3 This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4 Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

 

1 In manufacturing, the key of end cover hinder is welding.
2 Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends.
3 In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
4 When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers.

 

 

Materials


1. Carbon steel:20G,SA-106B,SA-106C,etc.

2. Low-alloy thermal resistant steel:15CrMoG,12Cr1MoVG,SA-335P12,SA335-P22,etc.

3. Middle-alloy thermal resistant steel:SA-335P91,etc.

4. Special material(ultra-supercritical):SA-335P122,SA-335P92,etc.

 

The boiler headers have water wall header,superheater header,economizer header and so on. It acts action of gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.

 

Certificates


Power Plant Boiler Manifold Headers ASME standard Boiler Parts 1

 

 

Factory Workshop


Power Plant Boiler Manifold Headers ASME standard Boiler Parts 2

 

 

products
PRODUCTS DETAILS
Power Plant Boiler Manifold Headers ASME standard Boiler Parts
MOQ: 1 Set
Price: Negotiable
Standard Packaging: Iron Frame Package
Delivery Period: 30 working days
Payment Method: L/C, T/T
Supply Capacity: 500 tons/month
Detail Information
Place of Origin
Jiangsu , China
Brand Name
HDB
Certification
ISO9001 , SGS , TUV , ASME , EN
Model Number
Boiler Manifold Header
Condition:
New
Working Temperature:
445 Degree
Application:
Power Station
Material:
Carbon Steel,Stainless Steel
OEM:
Yes
Color:
Customized
Minimum Order Quantity:
1 Set
Price:
Negotiable
Packaging Details:
Iron Frame Package
Delivery Time:
30 working days
Payment Terms:
L/C, T/T
Supply Ability:
500 tons/month
High Light

header in boiler

,

headers and manifolds

Product Description
 
 
Power Plant Boiler Manifold Headers ASME standard Boiler Parts
 
 
Product Description of Manifold Headers

In manufacturing, the key of end cover hinder is welding. Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends. In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
 
When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers. Such welding methods have high manufacturing efficiency, good quality, beautiful welding shape, safety, reliability, etc.
Material Carbon steel,Alloy steel,Stainless steel.
Length According to costumes requirements.
Temperature Range 300℃~1500℃
Diameter(OD) 76mm~914mm

 

 

Details of Manifold Headers


1.The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.

 

2.In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.

 

Features of Manifold Headers


1. Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.

5.Excellent in welding quality, highly automatic, safe and reliable.

 

Power Plant Boiler Manifold Headers ASME standard Boiler Parts 0

 

Classification of Manifold Headers


 

1 Headers form an important part of all types of boilers.
2 Steam from the generating tubes is collected in headers which are therefore always under pressure.
3 This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4 Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

 

1 In manufacturing, the key of end cover hinder is welding.
2 Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends.
3 In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
4 When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers.

 

 

Materials


1. Carbon steel:20G,SA-106B,SA-106C,etc.

2. Low-alloy thermal resistant steel:15CrMoG,12Cr1MoVG,SA-335P12,SA335-P22,etc.

3. Middle-alloy thermal resistant steel:SA-335P91,etc.

4. Special material(ultra-supercritical):SA-335P122,SA-335P92,etc.

 

The boiler headers have water wall header,superheater header,economizer header and so on. It acts action of gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.

 

Certificates


Power Plant Boiler Manifold Headers ASME standard Boiler Parts 1

 

 

Factory Workshop


Power Plant Boiler Manifold Headers ASME standard Boiler Parts 2

 

 

Sitemap |  Privacy Policy | China Good Quality Superheater Coil Supplier. Copyright © 2017-2024 Zhangjiagang HuaDong Boiler Co., Ltd. . All Rights Reserved.