Send Message
Home ProductsBoiler Manifold Headers

Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant

Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant

  • Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant
  • Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant
  • Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant
Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant
Product Details:
Place of Origin: China
Brand Name: HD Boiler
Certification: ISO9001 , SGS , TUV , ASME , EN
Model Number: Double H Fin Tube
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set / Sets 10tons
Price: Negotiable
Packaging Details: Seaworthy Packing
Delivery Time: 50 Days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 800 Tons / Year
Contact Now
Detailed Product Description
Capacity: 660 MW Type: Ultra Super Critical
Material: 15CrMoG / 12Cr1MoVG Working Temperature: 445 Deg C
Pressure: 32.1 Plant: Coal Fired
High Light:

660MW header in boiler

,

660MW boiler header manifolds

,

12Cr1MoVG Coal Fired manifolds

Panel header 660 MW coal fired ultra super critical power plant working pressure 32.1MPa 445 deg C temperature
 
Product Description
 
1 Headers form an important part of all types of boilers.
2 Steam from the generating tubes is collected in headers which are therefore always under pressure.
3 This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4 Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

 

1 In manufacturing, the key of end cover hinder is welding.
2 Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends.
3 In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
4 When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers.

 

Details

 

1.The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.

2.In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.

 

Features

 

1. Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.

5.Excellent in welding quality, highly automatic, safe and reliable.

 

Classification

 
Material Carbon steel,Alloy steel,Stainless steel.
Length According to costumes requirements.
Temperature Range 300℃~1500℃
Diameter(OD) 76mm~914mm
Boiler Header Manifolds 660MW Coal Fired Ultra Super Critical Power Plant 0

Contact Details
Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Person: Miss. Sandy Chen

Fax: 86- 512-58774453

Send your inquiry directly to us (0 / 3000)

Contact

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China