Send Message
Home ProductsBoiler Economizer

ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator

ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator

  • ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator
  • ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator
  • ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator
  • ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator
ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator
Product Details:
Place of Origin: China
Brand Name: HDB
Certification: ASME, EN, ISO9001, SGS
Model Number: Boiler Economizer
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: Negotiable
Packaging Details: Seaworthy packing
Delivery Time: 60~150 days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 500 tons per month
Contact Now
Detailed Product Description
Porduct Name: Boiler Economizer Application: Coal-fired Boilers And Waster Incinerator
Material Of Base Tube: SA210A1 Keyword: Boiler Economizer Banks
Production Technique: Hot Bending, Extrusion Loading Port: Shanghai, China
High Light:

Hot Bending Boiler Economizer

,

Boiler Economizer With 210° Shields

,

Boiler Economizer For Waste Incinerator

 

ASME Standard Boiler Economizer Made of SA210A1 Tubes with 210° Shields for Waste Incinerator

 

Product Introdution

 

Economizer tube is an important part of boiler, which is mainly made of seamless steel tube by bending or folding.
Cast iron economizer consists of a series of horizontal cast iron pipes connected to each other with cast iron elbows and flanged ends.

 

 

Parameters of Boiler Economizer

 

Description Boiler economizer
Material Alloy steel, Carbon steel, SA210C ,SA213T22, etc.
Material standard ASTM, EN or ISO etc.
Dimension Customization
Weight

Min: 10 ton

Max.:1000 ton

   
Process Material→Tube Bending and Bevelling → Butt Welding→ Shield Manufacturing → Assembly 1 →RT→Handcuffs and Shields Welding→Assembly 2 →Hydro Test →Cleaning and Painting →Packing into Frames
   

ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator 0

 

 

Working Process of Boiler Economizer

 

There are three stages from the feed water in the boiler heated into superheated steam:feed water preheating, evaporation, and superheating. The three stages are finished on three different heating surfaces. The boiler steam and water circuit are composed of the three different heating surfaces as well as their connecting pipes. Boiler economizers are one of them, and it is right the equipment to preheat the feed water. Thus, it is the heating surface with the lowest temperature for boiler working fluid in the boiler steam and water circuit. The working fluid passing through this equipment is monophasic water(non-boiling economizer).

 

Company Profile

 

The products of our company have been widely used in major power plants of various provinces and cities in China, bringing stable and significant economic and social benefits to cooperated power plants. At the same time, we attach great importance to product development and strive to improve product quality. Through the cooperation with a number of domestic and foreign companies, we constantly explore the international market.

ASME Standard Boiler Economizer Of SA210A1 Tubes With 210° Shields For Waste Incinerator 1

Contact Details
Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Person: Miss. Sandy Chen

Fax: 86- 512-58774453

Send your inquiry directly to us (0 / 3000)

Contact

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China