Send Message
Home ProductsBoiler Manifold Headers

CFB Boiler Manifold Headers Pressure Parts For Utility Boiler , ASME Certification

CFB Boiler Manifold Headers Pressure Parts For Utility Boiler , ASME Certification

  • CFB Boiler Manifold Headers Pressure Parts For Utility Boiler , ASME Certification
  • CFB Boiler Manifold Headers Pressure Parts For Utility Boiler , ASME Certification
  • CFB Boiler Manifold Headers Pressure Parts For Utility Boiler , ASME Certification
  • CFB Boiler Manifold Headers Pressure Parts For Utility Boiler , ASME Certification
CFB Boiler Manifold Headers Pressure Parts For Utility Boiler , ASME Certification
Product Details:
Place of Origin: Jiangsu , China
Brand Name: HDB
Certification: ISO9001 , SGS , TUV , ASME , EN
Model Number: Boiler Manifold Header
Payment & Shipping Terms:
Minimum Order Quantity: 1 Set
Price: Negotiable
Packaging Details: Seaworthy Packaging
Delivery Time: 35 working days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 500 ton/month
Contact Now
Detailed Product Description
Application: Power Plant Working Temperature: 445 Degree
Type: Ultra Super Critical Material: 15CrMoG / 12Cr1MoVG
OEM: Yes Color: Customized
High Light:

header in boiler

,

boiler header manifolds

 
CFB Boiler Manifold Headers Pressure Parts For Utility Boiler ASME Certification
 
Product Description
 
The steam boiler pressure part header with large diameter longitudinal welded pipe have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.

Technical parameters of customer design boiler pressure parts header for CFB boiler
The headers of boilers include water-cooling hinders of boilers proper, economizer hinders, superheater hinders, etc. They function for gathering, mixing and redistribution in boiler systems. In structure, they include end cover hinders or necking hinders.
 
1 Headers form an important part of all types of boilers.
2 Steam from the generating tubes is collected in headers which are therefore always under pressure.
3 This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4 Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

CFB Boiler Manifold Headers Pressure Parts For Utility Boiler , ASME Certification 0

 

Details

 

The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.


Depending on the temperature and pressure of headers, Vallourec supplies tubes in carbon steel to high-alloy ferritic steels such as T/P91 or T/P92, with sizes ranging from 88.9 mm to 406.4 mm.

 

Features

 

The pressures and temperatures that headers have to withstand depend on the component to which they are connected. A header connected to an economizer or to water wall panels is subject to less severe requirements on the material than a header connected to superheaters or reheaters.

 

Depending on the temperature and pressure of headers, Vallourec supplies tubes in carbon steel to high-alloy ferritic steels such as T/P91 or T/P92, with sizes ranging from 88.9 mm to 406.4 mm.

 

CFB Boiler Manifold Headers Pressure Parts For Utility Boiler , ASME Certification 1

 

Classification

 
Material Carbon steel,Alloy steel,Stainless steel.
Length According to costumes requirements.
Temperature Range 300℃~1500℃
Diameter(OD) 76mm~914mm

 

Application

CFB  distributing economizer header with high welding technique have water wall header, superheater header, economizer header and so on, it acts as collection, mixture, re-distributing working medium, as the structure, it can be classified as the end cover type( end enclosure) and necking down type.

CFB Boiler Manifold Headers Pressure Parts For Utility Boiler , ASME Certification 2

 

Factory Workshop

 

CFB Boiler Manifold Headers Pressure Parts For Utility Boiler , ASME Certification 3

 

 

Contact Details
Zhangjiagang HuaDong Boiler Co., Ltd.

Contact Person: Miss. Sandy Chen

Fax: 86- 512-58774453

Send your inquiry directly to us (0 / 3000)

Contact

Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China

Factory Address:Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China